Events for December , 2018

To view copy of Event Notice Click on Underlined HOUR
2018
10:00

Petition of Mahalaxmi Vidyut Pvt. Limited for Refund of Evacuation charges and Maintenance charges and Breach of P. P. A. dated 18-12-2010, executed between petitioner and Respondent.

 

[171 of 2018]
 

 

  10:00

Petition of Maharashtra State Power Generation Company Limited compliance to directives in the Order in Case No. 59 of 2017 dated 14.12.17 for approval of Capital Cost and Tariff of Koradi Generating Units 8, 9 & 10, Chandrapur Units 8 & 9 and Parli Unit 8.

 

 

[172 of 2018]
 

 

  10:00

Petition of M/s Topworth Urja and Metals Ltd under Sections 94 of the Electricity Act, 2003 Read With Regulation 85,92,93,94 and 95 of the MERC (Conduct of Business) Regulations, 2004 Review of the Order dated 4 May, 2018 passed in Case No.5 of 2016.

 

 

[174 of 2018]
 

  10:00

Petition of The Indian Hotels Company Limited under Sections 86 (1)(a) and 86 (1)(k) read with section 62 of the Electricity Act, 2003, seeking declaratory reliefs in respect of refund of the Transport Division Loss Recovery Charge illegally collected by the Respondent during the period FY 2012-13 to FY 2015-16.

 

 

[190 of 2018]
 

  10:00

Petition of Pravin Mormukut Brijwasi, as partner Rajyog Group Venture & Others for regarding Violation by MSEDCL of Supply Code Regulations and in the matter of the Order of Assessment dated 30/05/2018.

 

 

[202 of 2018]
 

  10:00

Petition of M/s. Lloyds Metals & Energy Ltd. for suggestive promotional measures as called for by the Hon'ble MERC by its Order dated 02 may 2018.

 

 

[278 of 2018]
 

2018
10:00

Petition of Ordnance Factory Ambajhari Seeking Intervention and Direction of this Hon’ble Commission U/s. 86 (1) (e) of the Electricity Act, 2003 in matter of 5 MW Ground Mounted Grid Connected PV Solar Power Plant installed by M/s. Azure Power Uranus Pvt. Ltd. at Ordnance Factory Ambajhari, Nagpur, under 300 MW Defence Scheme of Government of India.

 

[211 of 2018]
 

 

  10:00

Petition of Bharat Electronics Limited under Regulation 15 R/W Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 for Review of Order dated 15.06.2018 in case No. 160/2017 (Allocation of 3 MW Solar Power Project to Ammunition Factory Khadki, Pune, Under 300MW Defence Scheme of Govt. if India.)

 

[217 of 2018]
 

 

  10:00

Petition of Century Rayon seeking Review of the Order dated 25.04.2018 passed by this Hon'ble Commission in Case i.e. M.A. No.18 of 2017 filed in MERC Case No.99 of 2017 and by review seeking implementation of interim relief from retrospective effect i.e. from the date of MYT Order i.e. dated 03.11.2016 passed in Case No.48 of 2016.

 

[246 of 2018]
 

 

  10:00

Petition of Gateway Terminals India Private Limited under Section 62 (6) of the Electricity Act, 2003 for an unlawful Tariff charged from the Petitioner by the Respondent by way of a Levy of 20% service charge as per Article 8.19 of a License agreement executed between the Petitioner and Respondent.

 

[247 of 2018]
 

  

 

  10:00

Petition of Laxmipati Balaji Supply Chain Management Limited for taking on record the deemed Distribution Licensee status of the Petitioner, Laxmipati Balaji Supply Chain Management Limited ("LBSCML"/Co-Developer") for the Sector Specific SEZ and Information Technology (IT) SEZ being developed by Arshiya International Limited ("AIL"/"Developer") at Village Sai, Taluka Panvel, Dist. Raigad, Maharashtra, and for issuing the Specific Conditions of Distribution License, as may be made applicable to the Petitioner.

 

[275 of 2018]
 

 

  10:00

Petition of M/s Adani Power Maharashtra Limited under Section 86 read with Section 63 of the Electricity Act, 2003 and Article 13 of the PPAs dated 08.09.2008, 31.03.2010, 09.08.2010 and 16.02.2013 for approval of relief under Change in Law for shortfall in domestic coal under SHAKTI Policy after 31.03.2017 and grant of Carrying Cost.

 

[290 of 2018]
 

  

  10:00

Petition of M/s Adani Power Maharashtra Limited under Section 86 read with Section 63 of the Electricity Act, 2003 and Article 13/10 of the PPAs dated 08.09.2008, 31.03.2010, 09.08.2010 and 16.02.2013 for approval of grant of Carrying Cost in respect of relief granted under the order dated 07.03.2018 for Domestic coal shortfall till 31.03.2017.

 

[295 of 2018]
 

  

2018
10:00

Suo moto proceeding in the matter of taking on record the Deemed Distribution Licensee status of the Indian Railways and issuing Specific Conditions of Distribution Licence applicable to it.

 

[149 of 2017]
 

 

  10:00

Petition of Gold Corporation for grant of Intra-State Trading Licence, to undertake trading of electricity, for 50 MU for the first year and gradually increase to 100 MU over a period of next five years, in the State of Maharashtra.

 

[174 of 2017]
 

 

  10:00

Petition of Essar Steel India Limited (ESIL) against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking exemption from Cross Subsidy Surcharge as Essar Steel India Limited is a captive user in accordance with Section 42 of the EA, 2003 read with Rule 3 of the Electricity Rules 2005 along with Regulations framed by the Commission from time to time.

 

[45 of 2018]
 

 

  10:00

Petition filed by Maharashtra State Electricity Distribution Company Ltd for removal of difficulties in interpretation of dedicated distribution facilities and it's implementation for MSEDCL in MERC (Electricity Supply Code and other conditions of supply) Regulations, 2005 for agriculture connections.

 

[346 of 2018]
 

 

2018
10:00

Petition of Maharashtra State Electricity Distribution Co. Ltd for Review of the Order dated 04.05.2018 in Case No. 36 of 2017 passed by the Hon'ble Commission in Petition filed by M/s. Classic Citi Investments Pvt. Ltd. challenging Maharashtra State Electricity Distribution Co. Ltd.'s Circular dated 31.12.2016, rejection of Medium-Term Open Access applications and related issues.

 

[318 of 2018]
 

 

  10:00

Implementation of the Appellate Tribunal for Electricity ( ATE)'s Judgment dated 07 August, 2018 in Appeal No. 77 of 2015 filed by Global Energy Private Ltd. (GEPL) challenging Commission's Order dated 19 December, 2014 in Case No. 148 of 2014, (Petition of M/s. Global Energy Limited for seeking issuance of appropriate directions upon the Respondent for levy of Tariff by arbitrarily subjecting the partial open access consumers to a different tariff category which is contrary to the provisions of the Electricity Act, 2003.)

 

[148 of 2014]
 

  10:00

Petition of M/s Vinchurkar-Pawar Diagnostic Centre against MSEDCL for non-compliance of Judgement / Order dated 11.04.2017 passed by CGRF, Nashik Zone in Case No. 76/16- 17.

 

[107 of 2018]
 

 

  10:00

Petition of Shri Laxman Mahadev Galave against MSEDCL for non compliance of Electricity Ombudsman Order dated 7.3.2018 passed in Representation No. 23 of 2018 and CGRF Kolhapur Order dated 16.10.2017.ion vide Trading License bearing No. 01 of 2018 dated 27.04.2018.

 

[216 of 2018]
 

 

  10:00

Petition of Jain Agriculture Equipment against Maharashtra State Electricity Distribution Co. Ltd under Section 142 & 146 of the Electricity Act, 2003 for Non compliance of Orders dated 08/06/2018 passed by Hon'ble Appellate Authority in case No. 01/2018.

 

[220 of 2018]
 

 

  10:00

Petition of M/s. Paranjape Autocast Private Limited under Section 142, 146 and 149 of the Electricity Act, 2003 for non-compliance of order of the CGRF, Baramati Zone, constituted by the MERC Regulations and offence has been committed is attributable to most careless neglect on the part of officer of Company regarding the matter of non compliance of CGRF order and wrong application of the dedicated distribution facility by the MSEDCL and attempt of illegal recovery against existing infrastructure by the MSETCL.

 

[234 of 2018]
 

 

  10:00

Petition of Dr. Shri. Hemant Janardan Kotwal, Sun Scan center (Hospital) against MSEDCL under Section 142 & 146 of the EA, 2003 for non-compliance of the GGRF Order, Nashik in Case No.30/2017-18, Dt. of order: 02/02/2018.

 

[240 of 2018]
 

 

  10:00

Petition of Dr. Shri. Girish Dadasaheb Dhadwad, Sun Scan center (Hospital) against MSEDCL under Section 142 & 146 of the EA, 2003 for non-compliance of the GGRF Order, Nashik in Case No.29/2017-18, Dt. of order: 02/02/2018.

 

[241 of 2018]
 

 

  10:00

Petition of M/s Maa Rajulde Agro Industries against MSEDCL for non-compliance of order passed by Hon'ble Akola CGRF in complaint No. 16/2018 order dated 28.05.2018.

 

[254 of 2018]
 

 

  10:00

Petition of The President General Merchants Distributor's Co-operative market cum Housebuilding Society Ltd., for non-compliance of order passed by Hon'ble Akola CGRF in complaint No. 15/2018 order dated 28.05.2018

 

[255 of 2018]
 

 

  10:00

Petition of M/s. Krishna Valley Power Private Limited and Sahyadri Renewable Energy Private Ltd for non compliance of the Order of Hon'ble Commission, Order dated 15.01.2018 passed in Case No. 137 of 2017.

 

[260 of 2018]
 

 

  10:00

Petition of CLC Global A division of CLC Industries Ltd (formerly known as Spentex Industries Limited) under Section 142 & 149 (2) of the Electricity Act, 2003 for non-compliance of the MERC direction by MSEDCL and to reconsideration of Interst Rate & Period of applicability for refund of SLC /ORC /Meter Cost Etc.

 

[261 of 2018]
 

 

  10:00

Petition of Adani Power Maharashtra Limited under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 85 of the MERC (Conduct of Business Regulations), 2004 seeking review of the Order dated 19.04.2018 by this Hon’ble Commission in Case No. 102 of 2016.

 

[302 of 2018]
 

  

 

  10:00

Petition filed by Pegasus Properties Pvt. Ltd against Maharashtra State Electricity Transmission Company Limited. seeking refund of amounts/costs incurred by the Petitioner towards establishing 220 KV EHV Transmission Lines/Towers and 220 KV EHV Substation/Switchyard.

 

[351 of 2018]
 

 

2018
10:00

Petition of Zaveri & Co Zaveri & Co. Private Limited seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs 45,94,975/00 (Rs forty five lakh ninety four thousand nine hundred seventy five only)

 

[143 of 2018]
 

  

 

  10:00

Petition of Zaveri & Co Exports for seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a Sum Total of Rs 12,18,004/00 (Rs Twelve Lakh Eighteen Thousand Four only)

 

[144 of 2018]
 

  

 

  10:00

Petition of Purshottam Lohia for seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs. 27,26,160/- (Rupees Twenty Seven Lakhs Twenty Six Thousand One Hundred Sixty Only).

 

[145 of 2018]
 

  

 

  10:00

Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated October 10, 2014.

 

[148 of 2018]
 

  

 

  10:00

Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated March 21, 2017.

 

[149 of 2018]
 

  

 

  10:00

Petition of M/s. Bothe Windfarm Development Private Limited seeking remittance and release of the due and payable monthly invoices raised upon MSEDCL by M/s. Bothe Windfarm Development Private Limited towards power supplied till date under various Energy Power Purchase Agreements.

 

[185 of 2018]
 

  

 

  10:00

Petition of Dynamic Process Private Limited for seeking directions from the Hon’ble Commission to MSEDCL for payment of outstanding bills immediately alongwith delayed payment charges and interest accrued thereupon and petition requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of clause 12 of the Energy Purchase Agreement entered between the Petitioner and the Respondent.

 

[205 of 2018]
 

  

 

  10:00

Petition of M/s. Bhilwara Green Energy Limited under section 86 (1) (f) of the Electricity Act, 2003 field on behalf of M/s. Bhilwara Green Energy Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provision of the various Wind Energy Purchase Agreements entered into between the parties.

 

[222 of 2018]
 

  

 

  10:00

Petition of Hindustan Petroleum Corporation Limited under Section 86 (1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Hindustan Petroleum Corporation Limited and MSEDCL.

 

[223 of 2018]
 

  

 

  10:00

Petition of M/s Bengal Cardboard Industries & Printers Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Bengal Cardboard Industries & Printers Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited

 

[229 of 2018]
 

  

 

  10:00

Petition of M/s Vostok (Fareast) Securities Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Vostok (Fareast) Securities Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited

 

[230 of 2018]
 

  

 

  10:00

Petition of M/s Silverline Investment Company Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Silverline Investment Company Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited

 

[231 of 2018]
 

  

 

  10:00

Petition of Jewelex India Private Limited under Section 86(1)(f) of the Electricity Act, 2003 seeking directions from the Hon’ble Commission to MSEDCL for payment of outstanding bills immediately alongwith delayed payment charges and interest accrued thereupon and other remedies and petition requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 12 of the Energy Purchase Agreement dated 24.04.2006 entered between the Petitioner and the Respondent .

 

[232 of 2018]
 

  

 

  10:00

Petition of M/s Green Infra BTV Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra BTV Limited under Energy Purchase Agreements executed on 06.11.2012 and 21.02.2013

 

[243 of 2018]
 

  

 

  10:00

Petition of Shah Promoters & Developers under Section 86(1)(f), 86(1)(k), 142 and 146 of the Electricity Act, 2003 pertaining to adjudication of disputes between Shah Promoters & Developers and Maharashtra State Electricity Distribution Company Limited.

 

[245 of 2018]
 

  

 

  10:00

Petition of Mrs. Aishwarya Rai Bachchan under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mrs. Aishwarya Rai Bachchan and Maharashtra State Electricity Distribution Company Limited.

 

[256 of 2018]
 

  

 

  10:00

Petition of M/s Green Infra Wind Energy Project Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra Wind Energy Project Limited under Energy Purchase Agreements executed on 03.03.2014, 11.03.2014 and 15.03.2014.

 

[257 of 2018]
 

  

 

  10:00

Petition of M/s Green Infra Wind Energy Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra Wind Energy Limited under Energy Purchase Agreement executed on 19.07.2007.

 

[258 of 2018]
 

  

 

  10:00

Petition of M/s Green Infra Wind Energy Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra Wind Energy Limited under Energy Purchase Agreements executed on 19.08.2014 and 07.10.2014

 

[259 of 2018]
 

  

 

  10:00

Petition of Mrs. Geetha Pundaleeka under section 86 (1) (f) read with petition under Regulation 92, 93 and 94 of the MERC (Conduct of Business) Regulations, 2004 praying the Hon’ble Commission to exercise its inherent powers.

 

[262 of 2018]
 

  

 

  10:00

Petition of M/s Green Infra Corporate Solar Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra Corporate Solar Limited.

 

[267 of 2018]
 

  

 

  10:00

Petition of Mahanagar Developers under Section 86(1)(f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between Mahanagar developers and MSEDCL.

 

[273 of 2018]
 

  

 

  10:00

Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking direction of the Commission to Global Energy Private Limited (GEPL) to pay outstanding amount of the Standby Arrangement under the Standby Power Agreements dated 13 June, 2014, 29 August, 2015 and 30 June, 2016.

 

[78 of 2018]
 

  

 

  10:00

Petition of Shyam Indus Power Solutions Pvt. Limited under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Global Energy Pvt Ltd.

 

[274 of 2018]
 

  

 

  10:00

Petition of Global Energy Private Limited under the Proviso to Section 43(2) of the Electricity Act, 2003, and Section 86(1)(f), 86(1)(k) and other applicable provisions of the Electricity Act 2003 read with Regulations 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004, and in connection with the dispute and differences arising under the standby power agreement dated 13th June 2014 amended from time to time on 8th July 2014, 29th August, 2015 and 30th June 2016 executed between Global Energy Private Limited (GEPL) and Maharashtra State Electricity Distribution Company Limited

 

[299 of 2018]
 

  

 

2018
10:00

Petition of Essam Gas Pvt. Ltd seeking clarifications as to the applicability of its Tariff Order dated 03.11.2016 in Case No. 48 of 2016 on the issue of exceeding Contract Demand during night hours and directing the Respondent MSEDCL to extend full benefits of Load Factor Incentives to the Petitioner.

 

[60 of 2018]
 

 

 

  10:00

Petition of Rattan India Power Limited under Section 86 of the Electricity Act, 2003 read with Article 10 ("Change in Law") of PPAs dated 22.04.2010 and 05.06.2010 executed between Maharashtra State Electricity Distribution Company Limited (MSEDCL) and Rattan India Power Limited (RPL) for appropriate adjustment in tariff due to "Change in Law" which substantially affects cost and revenue of the project.

 

[227 of 2018]
 

 

 

  10:00

Petition of Dodson-Lindblom Hydro Power Private Limited under Section 86 (1) read with Section 62, 142 and 146 of the Electricity Act, 2003 and MERC (Renewable Purchase Obligation, its compliance and implementation of REC Framework), Regulations, 2010 for adjudication of disputes between Petitioner and Respondent No. 1.

 

[251 of 2018]
 

 

 

  10:00

Petition of Pudumjee Paper Products Ltd. under Section 62(6) of the Electricity Act, 2003 for Illegal levy of Voltage Surcharge from the Petitioner Company by the Respondent Distribution Licensee on power supplied through Express Feeder as well as on power supplied through Distribution Open Access.

 

[271 of 2018]
 

 

 

  10:00

Petition of Tata Power Renewable Energy Limited under Section 63 of the Electricity Act, 2003 for approval and determination of compensation on account of Change in Law for Solar Project.

 

[276 of 2018]
 

 

 

  10:00

Petition filed by M/s. Adani Renewable Energy (RJ) Limited under Section 86(1)(b) and Section 86(1)(f) of the Electricity Act, 2003 read with Article 9 of the PPA dated 27.07.2018, executed between Adani Renewable Energy (RJ) Limited and MSEDCL, for seeking approval of Change in Law events due to promulgation of levy of Safeguard Duty on the import of Solar Cells, whether or not assembled in modules or panels, by Ministry of Finance, Department of Revenue’s Notification No. 01/2018-Customs (SG) dated 30.07.2018.

 

[325 of 2018]
 

 

 

2018
10:00

Petition of Mahindra Lifespace Developers Ltd., seeking compliance of the Order dated 31.01.2018 passed by the Appellate Authority under Section 127 of the EA, 2003 in Appeal No 183 of 2010.

 

[106 of 2018]
 

 

 

  10:00

Petition of Suzlon Energy Limited for seeking refund / compensation for erecting evacuation infrastructure installed for connecting renewable energy project to the grid.

 

[228 of 2018]
 

 

 

  10:00

Petition of Mahati Hydro Power Projects Private Limited under Section 86(1)(f) of the Electricity Act, 2003 for seeking compliance of MSEDCL to meet start-up power requirement for its 2 X 2 MW Sonawade Small Hydro Electric Project through existing evacuation network and allow to continue the netting-off of start-up power against power supplied by Mahati Hydro Power Projects Private Limited from its Sonawade Small Hydro Electric Project according to the Energy Purchase Agreement and as per the MYT Order dated November 03, 2016 in Case No 48 of 2016 pronounced by this Hon’ble Commission.

 

[244 of 2018]
 

 

 

  10:00

Petition of Shri. Rajesh s/o Mahadeorao Babhulkar under Section 67 (2) (e) of Electricity Act 2003 r/w rule 13 (3) of Maharashtra Electricity work license rules 2012 for the determination of valuation and payment of compensation of neera of palm tree (sindi tree).

 

[253 of 2018]
 

 

 

  10:00

Petition of M/s Shree Cement Limited under section 86 (1) (E) of the Electricity Act, 2003 seeking amendment in Regulation 2(4) and 20.1 of MERC (DOA) Regulations, 2016 and clarification W.R.T simultaneous of Open Access facility and Banking of Power from Co-located RE Power Plant by an eligible Industrial Consumer.

 

[269 of 2018]
 

 

 

  10:00

Petition of M/s Fabtech Projects & Engineers Limited under Section 142 & 146 for Non-Comopliance of the DOA Regulations 2016 by MSEDCL and seeking directions for restoration of the Petitioner’s Contract Demand for the billing month August 2016 and consequential reliefs from the MSEDCL.

 

[272 of 2018]
 

 

 

  10:00

Petition of M/s Nidar Utilities Panvel Limited Liability Partnership for review of the Intra-State Transmission System Order dated 12th September, 2018 in Case No.265 of 2018.

 

[280 of 2018]
 

 

 

  10:00

The Petitioner Shri Veera Vaha Rathod has filed the Petition on 09.10.2018 regarding compensation for Transmission works on his land as per-Section 67(2-E) of the Electricity Act, 2003 and Rule 13(3) of Maharashtra Electricity Works of Licensees Rules, 2012.

 

[283 of 2018]
 

 

 

  10:00

Petition to seek clarification regarding the interpretation and scope of the Reg 2.1(q),Definition of "Meter" and the term "Defective Meter" used in Reg. 15.4 of the MERC ( Supply Code) Regulations, 2005 with respect to the sec 45 (3) of the I.E. Act,2003 and Reg 15.2 of the CEA (I&OoM), 2006, in the Light of the concerned provisions of the Consumer Protection Act,1986 and the Legal Metrological Act, 2009.

 

[284 of 2018]
 

 

 

  10:00

Petition filed by M/s Paradise Polymers Ltd under Section 142, 146 & 149 of the Electricity Act, 2003 seeking punishment for noncompliance of the interim and final Order passed by the Electricity Ombudsman at Mumbai on 13.04.2016 and 30.05.2016 respecticvely in representation No.20 of 2016.

 

[322 of 2018]
 

 

 

  10:00

Petition filed by Jaigad Power Transco Limited under Section 86 of the Electricity Act, 2003 and other applicable provisions of the Electricity Act, 2003.

 

[326 of 2018]
 

 

 

  10:00

Petition filed by Smt. Sarika Dilip Banachhode under Section 142 & 149 of the Electricity Act, 2003 for regarding non-compliance of CGRF, Kolhapur Zone’s Order dated 03 February, 2018 in Case No. 26 / 2017-18/ letter No. 23 by Maharashtra State Electricity Distribution Co. Ltd.

 

[330 of 2018]
 

 

 

2018
10:00

Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking direction of the Commission to Global Energy Private Limited (GEPL) to pay outstanding amount of the Standby Arrangement under the Standby Power Agreements dated 13 June, 2014, 29 August, 2015 and 30 June, 2016.

 

[78 of 2018]
 

  

 

  10:00

Petition of Shyam Indus Power Solutions Pvt. Limited under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Global Energy Pvt Ltd.

 

[274 of 2018]
 

  

 

  10:00

Petition of Global Energy Private Limited under the Proviso to Section 43(2) of the Electricity Act, 2003, and Section 86(1)(f), 86(1)(k) and other applicable provisions of the Electricity Act 2003 read with Regulations 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004, and in connection with the dispute and differences arising under the standby power agreement dated 13th June 2014 amended from time to time on 8th July 2014, 29th August, 2015 and 30th June 2016 executed between Global Energy Private Limited (GEPL) and Maharashtra State Electricity Distribution Company Limited

 

[299 of 2018]
 

  

 

  10:00

Petition of Spentex Industries Ltd. for Arbitrary Levy of Wheeling Charges & Applicable Loss for the Financial Year 2015-2016 and Financial Year 2016-2017 in contradistinction to provisions of Electricity Act, 2003 and Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations 2014 and Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations 2015.

 

[159 of 2018]
 

  

 

  10:00

Petition of Mahalaxmi Vidyut Pvt. Limited for Refund of Evacuation charges and Maintenance charges and Breach of P. P. A. dated 18-12-2010, executed between petitioner and Respondent.

 

[171 of 2018]
 

  

 

  10:00

Petition of M/s Topworth Urja and Metals Ltd under Sections 94 of the Electricity Act, 2003 Read With Regulation 85,92,93,94 and 95 of the MERC (Conduct of Business) Regulations, 2004 Review of the Order dated 4 May, 2018 passed in Case No.5 of 2016.

 

[174 of 2018]
 

  

 

  10:00

Petition of Spentex Industries Limited for Arbitrary Levy of Wheeling Charges & applicable Wheeling Loss for the FY 2015-2016 and FY 2016-2017 and for non-refund of Wheeling Charges & Wheeling Loss paid to erroneously levied by the Distribution Licensee MSEDCL.

 

[187 of 2018]
 

  

 

  10:00

Petition of M/s SEP Energy Private Ltd. under Sections 9 read with 42 (2) read with 49 read with 61 read with 62 read with 66 read with 86 (1) (f) read with 86 (3) and (4) of Electricity Act, 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations, 2016.

 

[291 of 2018]
 

  

 

  10:00

Petition of Abhijeet MADC Nagpur Energy Pvt. Ltd. under Section 86(1)(k) of the Electricity Act, 2003 read with Regulation 94 of MERC (Conduct of Business) Regulations, 2004 for determination of the User Fees in respect of dedicated transmission system and for adjudication of issues thereof.

 

[292 of 2018]
 

  

 

  10:00

Petition of Tata Power Renewable Energy Limited seeking for review of MERC Order dated 18 August, 2018 in Case No 204 of 2018.

 

[298 of 2018]
 

  

 

  10:00

Petition of JSW Centre under Section 86(1)(f) of the Electricity Act, 2003 read with section 142 of the Electricity Act, 2003.

 

[289 of 2018]
 

  

 

  10:00

Petition filed by Pegasus Properties Pvt. Ltd against Maharashtra State Electricity Transmission Company Limited. seeking refund of amounts/costs incurred by the Petitioner towards establishing 220 KV EHV Transmission Lines/Towers and 220 KV EHV Substation/Switchyard.

 

[351 of 2018]
 

  

 

2018
10:00

Implementation of the ATE's Judgment dated 10 February, 2015 in Appeal No. 70 of 2013 filed by Wardha power company Limited against MERC Case No 53 of 2012 Order dated 27.12.2012. (Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.)

 

[53 of 2012]
 

 

 

  10:00

Petition filed by Chamber of Marathwada Industries and Agriculture for Review of the MERC Order Dated 12.09.2018 in Case No. 195 of 2017.

 

[329 of 2018]
 

 

 

  10:00

Petition filed by Garware Polyester Limited for Implementation of power factor incentives and penalties in Case No.195 of 2017

 

[332 of 2018]
 

 

 

  10:00

Petition filed by Alloy Steel Producers Association of India for the ambit and scope of the MYT Framework under the Electricity Act, 2003; and in the matter of order dated 12.09.2018 passed by the Hon’ble Commission in Case No. 195 of 2017.

 

[338 of 2018]
 

 

 

  10:00

Petition filed by Vidarbha Industries Association for review / clarificatory petition of Case No. 195 of 2017 in the matter of Mid Term Review Petition of MSEDCL for truing up of ARR of FY 2015-16 and FY 2016-17, provisional truing-up of ARR of FY 2017-18 and revised projections of ARR for FY 2018-19 and FY 2019-20.

 

[344 of 2018]
 

 

 

  10:00

Petition filed by Shri Suresh Halwankar for implementation of mid -term review Order dated 12.09.2018 passed by the Hon'ble Commission in Case No. 195 of 2017.

 

[347 of 2018]
 

 

 

  10:00

Petition of Jawahar Shetkari Sahakari Sakhar Karkhana Ltd., for clarification of Order dated 12th July, 2018 passed by Hon’ble Commission in MERC case No. 84 of 2015.

 

[225 of 2018]
 

 

 

  10:00

Petition of Supreme Industries Limited (Unit No. III) against MSEDCL in the matter of forceful isolation of embedded Roof Top PV Solar plant capacity 1.36 MWp for captive use connected with internal bus of 415V. The Commission may issue directions under section 37 of DOAR-2016 and section 60, 66 & 86 (e) of Electricity Act, 2003.

 

[347 of 2018]
 

 

 

2018
10:00

Petition of Zaveri & Co Zaveri & Co. Private Limited seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs 45,94,975/00 (Rs forty five lakh ninety four thousand nine hundred seventy five only)

 

[143 of 2018]
 

  

  10:00

Petition of Zaveri & Co Exports for seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a Sum Total of Rs 12,18,004/00 (Rs Twelve Lakh Eighteen Thousand Four only)

 

[144 of 2018]
 

  

 

  10:00

Petition of Purshottam Lohia for seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs. 27,26,160/- (Rupees Twenty Seven Lakhs Twenty Six Thousand One Hundred Sixty Only).

 

[145 of 2018]
 

  

 

  10:00

Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated October 10, 2014.

 

[148 of 2018]
 

  

 

  10:00

Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated March 21, 2017.

 

[149 of 2018]
 

  

 

  10:00

Petition of M/s. Bothe Windfarm Development Private Limited seeking remittance and release of the due and payable monthly invoices raised upon MSEDCL by M/s. Bothe Windfarm Development Private Limited towards power supplied till date under various Energy Power Purchase Agreements.

 

[185 of 2018]
 

  

 

  10:00

Petition of Dynamic Process Private Limited for seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills immediately alongwith delayed payment charges and interest accrued thereupon and petition requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of clause 12 of the Energy Purchase Agreement entered between the Petitioner and the Respondent.

 

[205 of 2018]
 

  

 

  10:00

Petition of Mutual Technologies Private Limited under Section 86 (1) (f) of the Electricity Act, 2003 seeking directions from the Hon’ble Commission to MSEDCL for payment of outstanding bills immediately along with delayed payment charges and interest accrued thereupon and Petition requesting the Hon'ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of clause 12 of the Energy Purchase Agreement entered between the Petitioner and the Respondent.

 

[221 of 2018]
 

  

 

  10:00

Petition of M/s. Bhilwara Green Energy Limited under section 86 (1) (f) of the Electricity Act, 2003 field on behalf of M/s. Bhilwara Green Energy Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provision of the various Wind Energy Purchase Agreements entered into between the parties.

 

[222 of 2018]
 

  

 

  10:00

Petition of Hindustan Petroleum Corporation Limited under Section 86 (1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Hindustan Petroleum Corporation Limited and MSEDCL.

 

[223 of 2018]
 

  

 

  10:00

Petition of M/s Bengal Cardboard Industries & Printers Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Bengal Cardboard Industries & Printers Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited

 

[229 of 2018]
 

  

 

  10:00

Petition of M/s Vostok (Fareast) Securities Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Vostok (Fareast) Securities Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited

 

[230 of 2018]
 

  

 

  10:00

Petition of M/s Silverline Investment Company Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Silverline Investment Company Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited

 

[231 of 2018]
 

  

 

  10:00

Petition of Jewelex India Private Limited under Section 86(1)(f) of the Electricity Act, 2003 seeking directions from the Hon’ble Commission to MSEDCL for payment of outstanding bills immediately alongwith delayed payment charges and interest accrued thereupon and other remedies and petition requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 12 of the Energy Purchase Agreement dated 24.04.2006 entered between the Petitioner and the Respondent .

 

[232 of 2018]
 

  

 

  10:00

Petition of M/s Green Infra BTV Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra BTV Limited under Energy Purchase Agreements executed on 06.11.2012 and 21.02.2013

 

[243 of 2018]
 

  

 

  10:00

Petition of Shah Promoters & Developers under Section 86(1)(f), 86(1)(k), 142 and 146 of the Electricity Act, 2003 pertaining to adjudication of disputes between Shah Promoters & Developers and Maharashtra State Electricity Distribution Company Limited.

 

[245 of 2018]
 

  

 

  10:00

Petition of Mrs. Aishwarya Rai Bachchan under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mrs. Aishwarya Rai Bachchan and Maharashtra State Electricity Distribution Company Limited.

 

[256 of 2018]
 

  

 

  10:00

Petition of M/s Green Infra Wind Energy Project Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra Wind Energy Project Limited under Energy Purchase Agreements executed on 03.03.2014, 11.03.2014 and 15.03.2014.

 

[257 of 2018]
 

  

 

  10:00

Petition of M/s Green Infra Wind Energy Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra Wind Energy Limited under Energy Purchase Agreement executed on 19.07.2007.

 

[258 of 2018]
 

  

 

  10:00

Petition of M/s Green Infra Wind Energy Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra Wind Energy Limited under Energy Purchase Agreements executed on 19.08.2014 and 07.10.2014

 

[259 of 2018]
 

  

 

  10:00

Petition of Mrs. Geetha Pundaleeka under section 86 (1) (f) read with petition under Regulation 92, 93 and 94 of the MERC (Conduct of Business) Regulations, 2004 praying the Hon’ble Commission to exercise its inherent powers.

 

[262 of 2018]
 

  

 

  10:00

Petition of M/s Green Infra Corporate Solar Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra Corporate Solar Limited.

 

[267 of 2018]
 

  

 

  10:00

Petition of Mahanagar Developers under Section 86(1)(f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between Mahanagar developers and MSEDCL.

 

[273 of 2018]
 

  

 

  10:00

Petition filed by Maharshi Udyog seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs. 16,04,114/- (Rupees Sixteen Lakhs four six Thousand one hundred fourteen Only)

 

[339 of 2018]
 

  

 

  10:00

Petition filed by M/s. ACME Chittorgarh Solar Energy Private Limited for seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of imposition of safeguard duty on the import of solar cells and modules.

 

[340 of 2018]
 

  

 

  10:00

Petition of O. P Enterprises under section 86 (1) (f) read with petition under Regulation 92, 93 and 94 of the MERC (Conduct of Business) Regulations, 2004 praying the Hon'ble Commission to exercise its inherent powers and petition requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of Article 12.02 of the Energy Purchase Agreement dated 05.12.2009 entered between the Petitioner and the Respondent.

 

[285 of 2018]
 

  

 

  10:00

Petition of Kukreja Development Corporation under section 86 (1) (f) read with petition under Regulation 92, 93 and 94 of the MERC (Conduct of Business) Regulations, 2004 praying the Hon’ble Commission to exercise its inherent powers and Petition Requesting The Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of Article 12.02 of the Energy Purchase Agreements dated 31.10.2006 and 05.12.2009 entered between the Petitioner and Respondent.

 

[287 of 2018]
 

  

 

  10:00

Petition of Kukreja Enterprises under section 86 (1) (f) read with petition under Regulation 92, 93 and 94 of the MERC (Conduct of Business) Regulations, 2004 praying the Hon'ble Commission to exercise its inherent powers and Petition requesting the Hon'ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of Article 12.02 of the Energy Purchase Agreements dated 18.12.2006 and Article 11.04 of the Energy Purchase Agreements dated 22.02.2013 entered between the Petitioner and the Respondent.

 

[288 of 2018]
 

  

 

  10:00

Petition of M/s Bhabani Pigments Pvt. Limited under Section 86(1) (f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Bhabani Pigments Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited.

 

[293 of 2018]
 

  

 

  10:00

Petition of Mahati Hydro Power Projects Private Limited under Section 86(1) (f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mahati Hydro Power Projects Private Limited and Maharashtra State Electricity Distribution Company Limited.

 

[294 of 2018]
 

  

 

  10:00

Petition of Maharashtra State Electricity Distribution Company Limited seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawl by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006 in the matter of introduction of Availability Based Tariff Regime at State level within Maharashtra and other related issues.

 

[297 of 2018]
 

  

 

  10:00

Petition of Priyadarshini Polysacks Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between Priyadarshini Polysacks Limited and Maharashtra State Electricity Distribution Co. Limited.

 

[305 of 2018]
 

  

 

  10:00

Petition of Pertinent Infra and Energy Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between Pertinent Infra and Energy Limited and Maharashtra State Electricity Distribution Co. Limited.

 

[306 of 2018]
 

  

 

  10:00

Petition of Pristine Industries Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between Pristine Industries Limited and Maharashtra State Electricity Distribution Co. Limited.

 

[307 of 2018]
 

  

 

  10:00

Petition filed by Sun-N-Sand Hotels Private Limited for execution of the Hon. Commission’s Order dated 04th October 2018 in Case No 188 of 2018 under Section 86(1)(f) for adjucation of dispute on the issue of outstanding payments, of delayed payment surcharge and of interest on delayed payment surcharge by the Respondent.

 

[342 of 2018]
 

  

 

       

 

Home ABOUT US PHOTO GALLERY ORDERS RULES AND REGULATIONS PRESS RELEASE COMPLAINTS OTHER LINKS CONTACT US

IMPORTANT: Maharashtra Electricity Regulatory Commission to ensure the accuracy of information furnished in this website, MERC does not accept any responsibility or liability for any damage or loss to any person for the result of any action taken on the basis of these information. However, MERC shall be obliged if errors / omissions are brought to its notice for carrying out corrections in the next update.

DESIGNED, DEVELOPED & MAINTAINED BY:
Maharashtra Electricity Regulatory Commission
Best View at 800 * 600 resolution and IE 4 & Above
© Copyright MERC 2002 © Copyright MERC 2002