Before the
13th floor, Centre No.1, World Trade Centre,
Cuffe Parade, Mumbai 400 005.
Tel. 22163964 / 22163965, Fax No. 22163976
E-mail mercindia@mercindia.org.in
Website : www.mercindia.org.in
CASE No. 12 of 2004
In
the matter of
Review
of Order dated 1.7.2004 regarding determination of ARR and Tariff of M/s BSES
Ltd. (now Reliance Energy Limited)
Dr Pramod Deo, Member
Shri A. Velayutham, Member
ORDER
Dated: 23rd
December, 2004.
After an elaborate public process
and following the provisions of law, the Commission passed its detailed Order
in respect of the electricity tariff of M/s BSES Ltd. (now Reliance Energy
Ltd. -- REL) for FY 2004-05 and until next revision, on 1st July,
2004 in Case No. 18 of 2003. Thereafter, under affidavit dated 4th August,
2004, REL sought review of the Order on several counts. On the Commission’s
direction, REL submitted a further Petition on 24th August, 2004,
clarifying in respect of each point raised, how the Petition met the requirements
of review under Regulation 85(a) of the Commission’s Conduct of Business Regulations
rather than being the subject matter of appeal.
2.
At the outset, it would be useful to set out Regulation
85(a), which reads as follows:
“Any person aggrieved by a direction, decision or order of the Commission,
from which (i) no appeal has been preferred or (ii) from which no appeal is
allowed, may, upon the discovery of new and important matter or evidence which,
after the exercise of due diligence, was not within his knowledge or could
not be produced by him at the time when the direction, decision or order was
passed or on account of some mistake or error apparent from the face of the
record, or for any other sufficient reasons, may apply for a review of such
order, within 45 days of the date of the direction, decision or order, as
the case may be, to the Commission.“
3.
The Review Petition included, among other issues,
a prayer for redefining the LTP-2 category of REL at par with the definition
of the LTP-2 category determined in respect of the Tata Power Company (TPC).
In the meantime, the Commission also received representations from several
LTP-2 consumers of REL (mostly with loads between 15 HP to 50 HP and belonging
to the earlier LTP-2 category) stating that their bills had risen very sharply
and that they were faced with a tariff shock as a result of the revision and
rationalisation undertaken by the Commission. REL also submitted a letter
dated 15th September, 2004 in this regard, seeking that the Commission
address this issue by revising the applicability of the two-part tariff to
the LT industrial consumers in line with Maharashtra State Electricity Board
(MSEB)’s tariff structure or, alternatively, permit REL to defer the application
of the new tariff until the next Tariff Order. The Commission directed REL
to submit a supplementary affidavit to include this point fully in their Review
Petition.
4.
In response to the Notice for hearing, Prayas
(authorised consumer representative organisation) submitted in their letter
dated 20th September, 2004 that the Petition essentially seeks
reversal of many of the Commission’s key decisions, which would be against
consumer interest, e.g. automatic approval of all capital expenditure proposed
by REL in their ARR and modifying the normative debt-equity ratio to 50:50.
Prayas have also contended that adequate reasons have not been given for justifying
admission and that the Petition amounts to an appeal against the Commission’s
Order, for which the EA, 2003 stipulates a separate process and forum. Prayas
have, therefore, opposed admission.
5.
The Petition
was heard for admission on 20th September, 2004. Shri. Subodh Shah,
Director, REL, made a presentation on the issues raised in the Review Petition.
With regard to the LTP-2 category, Shri Shah submitted that, earlier, this
category applied to consumers with loads between 15 HP to 50 HP. It was also
a single-part tariff (i.e without fixed charges), and there was no Power Factor
(PF) penalty. The new LTP-2 category, however, covers consumers from 15 HP
upwards, and also introduces a two-part tariff along with PF surcharge. As
a result, the bills of many consumers in this category have risen very sharply.
Shri Shah stated that REL have around 12,000 consumers in the LTP 2 category,
and in many cases their bill amounts have increased by several times.
6.
With regard to the issues regarding the new LTP-2
tariff, the Commission drew attention at the hearing to its consistent philosophy,
applied in determining tariffs ever since its first Tariff Order for the MSEB
in the year 2000, which includes two part tariff, PF penalty, reduction in
the number of tariff slabs and categories, introduction of Contract Demand,
etc. The Commission expected REL to educate their consumers regarding the
philosophy and process of tariff determination and the rationale for various
changes. Since, unlike MSEB, REL's tariff had been scrutinised and revised
for the first time ever through the regulatory dispensation, the rationalisation
was bound to lead to some difficulties. However, the Commission decided that the Petition would be admitted only to the extent
of issues relating to LTP-2 and flowing from it, considering that there appears
to have been an inadvertent tariff shock which was inconsistent with the Commission's
stated philosophy. On this matter, therefore, the Commission was willing to
consider various solutions.
7.
As directed by the Commission, REL submitted an
additional affidavit on 24th September, 2004, outlining three options
for modifying the tariff applicable to the sub-category of 15 HP to 50 HP
consumers within the new LTP-2 category. REL elaborated on these options at
the second hearing held on 29th September, 2004.
8.
At this hearing, REL’s representatives submitted
that they had installed Maximum Demand (MD) meters for around 3,500 LTP-2
consumers, and were in the process of doing so for the remaining consumers
as per the schedule laid down by the Commission in its Order. REL expected
to achieve the metering target by November-end. In the meantime, REL are continuing
to charge those LTP-2 consumers in respect of whom MD meters have not yet
been installed as per the LTP-1 tariff, in accordance with the Tariff Order.
REL added that the problem of tariff shock had been realised where MD meters
have been installed. REL had intimated the concerned consumers to submit their
desired Contract Demand. In the meanwhile, REL had equated the Contract Demand
with the Sanctioned/Connected Load for billing purposes.
9.
Considering the urgent
need to mitigate the inadvertent tariff shock to this category of consumers
and to grant them immediate relief, the Commission decided to address the
issue of the LTP-2 tariff through an Interim Order issued on 30th September,
2004, pending its final Order on the Review Petition.
10.
The Interim Order stated that a basic principle
adopted by the Commission is that a fixed charge based on Contract Demand/Billed
Demand is more scientific than a fixed charge based on Connected Load or per
connection. Connected Load is often an area of dispute between the licensee
and the consumer, and any tariff design based only on Connected Load is inefficient
since it does not allow the consumer much scope to optimise his fixed expenses.
In respect of certain categories, in the absence of adequate data, the Commission
has been specifying fixed charges on the basis of Connected Load or per connection.
However, Contract Demand or Sanctioned Load are the correct indicators of
the load imposed by a consumer and agreed to be delivered by the electricity
supplier at any given point in time. This also ensures that the consumer is
charged for the facility created to cater to his Contracted Demand or Sanctioned
Load. The present problem has arisen partly because the Connected Load of
the affected consumers (which has remained unchanged for a long time) has
been directly equated with the Contract Demand. This has been aggravated due
to the widely fluctuating load usage pattern of many such consumers from month
to month. Because of low utilisation of Sanctioned Load, the concerned consumers
end up paying a very high bill, which was not intended by the Commission.
This is particularly so in the case of small industrial consumers in the REL
area who are unaware of the concept of Contract Demand and the need for optimising
the demand requirement to maintain a good load factor (i.e., equal to or more
than 60%).
11.
As pointed out by the Commission in its Interim
Order, the concept of Contract Demand has been prevalent for a long time in
the case of MSEB and Tata Power Company. The Commission again directs REL
to educate its consumers regarding the concept of Contract Demand and the
principles to be borne in mind while deciding its level keeping in view factors
such as the nature of work, the tariff, and the penalty for exceeding it.
The consumers, on their part, should also seek to understand the concept and
implications of Contract Demand and the need to enter into an agreement with
regard to Contract Demand. In this context, the Commission had explained in
its Interim Order the meaning of Sanctioned Load, Connected Load, Load Factor,
Contract Demand and Maximum Demand, which is broadly as follows:
“Sanctioned Load” means load in kilowatt
(kW)/Horsepower (HP) mutually agreed between the Distribution Licensee and
the consumer; i.e. the load specified
in the agreement.
“Load factor” means the ratio of
total number of units consumed during a given period to the total number of
units which may have been consumed had the contract demand/sanctioned load
been maintained throughout the same period, subject to availability of supply
from the Distribution Licensee and shall usually be expressed as a percentage;
“Contract Demand” means demand in
kilowatt (kW)/kilovolt ampere (kVA), mutually agreed between the Distribution
Licensee and the consumer as entered into in the agreement or other written
communication;
“Maximum Demand” in kilowatts or
kilovolt amperes, in relation to any period shall, unless otherwise provided
in any general or special order of the Commission, mean twice the largest
number of kilowatt hours (kWh) or kilovolt ampere hours (kVAh) supplied and
taken during any consecutive thirty minute blocks in that period.
In the past, the Licensees used to levy tariff on the basis of “Connected
Load”, which normally means the sum
of rated capacities of all the energy consuming devices on the consumer’s
premises, which can be operated simultaneously.
12.
As the Interim Order states, the Connected Load
will typically be higher than the Contract Demand, as all the equipments are
not used at the same time, resulting in diversity of load operations. The
consumers should have the freedom to reduce their Contract Demand based on
their actual requirements, after studying their total load, load factor, and
diversity factor rather than simply equating the Connected Load to Contract
Demand. Thus, consumers may opt for a level of Contract Demand which is less
than their Connected or Sanctioned Load, while at the same time taking into
account the penalty which has to be paid whenever Contract Demand is exceeded..
13.
Through its Interim Order, after careful consideration
and in order to give immediate relief to many affected consumers in a manner
consistent with its stated principles, the Commission decided to modify the
LTP-1 and LTP-2 tariff categories as follows, all other stipulations of the
principal Tariff Order remaining the same:
|
Tariff
as per Order dated 1.7.2004
|
Revised
Tariff w.e.f. 1.10.2004
|
||||
|
Category
|
Fixed
Charges
|
Energy
Charges
|
Category | Fixed Charges |
Energy
Charges
|
|
(paise/kWh)
|
(paise/kWh)
|
||||
| LTP-1 (0 to 15 HP) |
Rs.150 per month |
400
|
LTP-1 (0 to 50 HP) |
Rs.150 per month |
400
|
| LTP-2
(above 15 HP) |
Rs.374 per kVA |
300
|
LTP-2
(above 50 HP) |
Rs.374 per kVA |
300
|
The
Commission believes that the tariff revised as above has the advantage of
being easy to implement as well as bringing about greater parity in the tariffs
of REL and TPC, since TPC’s LT-1 category
(Commercial and non-Commercial supply having Contract Demand less than 100
kVA) has the same tariff. In its Interim Order, the Commission had applied
the above modification from 1st
October, 2004, i.e. prospectively.
14.
At the hearings, REL had agreed that the impact
of the above change on REL could be
taken up through the truing up process at the time of filing of the next Tariff
Petition. In order to assess its implications, REL were directed to submit
certain data regarding the consumption, Connected Load, Contract Demand and
revenue billed for LTP-1, LTP-2 and LTP-3 categories, over the period April
2004 to June 2004, and after the Tariff Order dated 1st July, 2004.
15.
Vide letter
dated 20th October, 2004, REL have given the relevant data for
FY03 and FY04, and the period from April to August 2004, of which data for
the two months of July and August are based on the revised tariffs. The Commission
has analysed the data to assess the actual impact of the tariff revision effected
on 1st July, 2004, vis-à-vis the impact estimated by the Commission
while issuing the Tariff Order. The present REL data has several inconsistencies
with the data submitted in the past for the years FY03 and FY04 on which the
Commission had projected the figures for FY05. The inconsistencies include:
§
The Connected Load for LTP categories combined
for July and August, 2004 is substantially higher than that given earlier
for FY03 and FY04.
§
The revenue against fixed charges for LTP-1 category
for July and August, 2004 appears to be very low as compared to the revenue
projected by the Commission in the Tariff Order.
§
The revenue from Demand Charges from LTP-3 category
indicated by REL is not commensurate with the Contract Demand indicated by
REL for this category
REL
are directed to clarify these discrepancies at the time of submitting their
next Tariff Petition.
16.
The Commission has also observed that the
actual revenue earned by REL from the LTP-2 category over the two-month period
of July and August 2004 is much higher than that estimated by the Commission
in the Tariff Order for the same period. The Commission is of the view that
the method adopted by REL for determining the Contract Demand or selecting
a proxy for Contract Demand on which Demand Charges are applicable and the
lack of awareness on the part of the consumers, coupled with the poor data
quality and the tariff revision has resulted in the tariff shock to this section
of consumers, which was never the intention of the Commission. The Commission
had directed REL, vide letter dated 12th August, 2004, to communicate
to consumers through the media and monthly energy bills the need to register their Contract Demand.Even so, it seems that
many consumers have yet to register their Contract Demand. The Commission
is of the view that the changes initiated by it to move towards the Contract
Demand regime, though desirable, have to be implemented in a phased manner,
after ensuring that the consumers are aware of the implications of Contract
Demand, are better able to fix it at an optimum level taking into account
the relevant factors and the nature of their business, and accordingly register
the same with REL. The Commission again directs REL to ensure that adequate
publicity is given to the concept of Contract Demand and should take the initiative
to ensure that the consumers register their Contract Demand with them.
17.
In the course of these proceedings, it has become clear that there are two types
of LT industrial consumers, viz., erstwhile LTP-3 consumers in whose case
MD meters had already been installed before the Tariff Order, and other LT
industrial consumers whose MD meters were in the process of being installed.
In both cases, many consumers have not registered their Contract Demand with
REL, since it was not relevant for tariff purposes in the past. Now it has
become necessary for all such consumers to register their desired level of
Contract Demand with REL. However, in the interim, taking into account the
various scenarios prevailing, the
Demand Charges for the present LTP-2
consumers (i.e. above 50 HP, as per the recategorisation effected by the Interim
Order dated 30th September, 2004) will be applicable on the Billing
Demand defined as follows:
The Monthly Billing Demand for LTP-2 consumers will be the higher of the
following:
--
Actual Maximum Demand recorded in the month
from 0600 hours to 2200 hours; or
--
50% of the Sanctioned Load/Connected Load/Contract
Demand, as the case may be.
Keeping
in view the considerations set out at para 16 above, this definition of Billing Demand will apply with retrospective
effect from 1st July, 2004, but will be valid only until 31st
March, 2005. After that date, the
definition contained in the original Tariff Order shall operate again, and
Demand Charges for those LTP-2 consumers who have not registered their Contract
Demand will be applied on the basis of their Connected Load.
18.
In its Interim Order dated 30th September,
2004, the Commission had addressed the inadvertent tariff shock to the new
LTP-2 category consumers through the recategorisation set out at para 13 above
as an emergent measure pending this final Order, and applied it with prospective
effect from 1st October, 2004, The Commission does not normally
revise tariffs with retrospective effect. However, in this case, having found
that there has been an inadvertent and unintended tariff shock because of
a combination of factors, going against its basic philosophy of tariff fixation,
the Commission has now decided to apply the recategorisation and consequent
change in tariff at para 13, earlier effected prospectively, with retrospective
effect from 1.7.2004 (i.e., the date of the original Tariff Order). The excess
billing and recovery from the concerned consumers arising from such retrospective
application should be refunded to them by REL by adjustment through energy
bills or by other means by the end of March, 2005, along with refunds arising
from the change in billing demand definition as at para 17 above. However,
no interest would be payable by REL. The Commission believes that, considering
the totality of circumstances and the ground realities, this dispensation
is fair and equitable to all concerned, and also takes into account the time
required for computing the amounts involved. The
impact on REL would be assessed and truing up resorted to at the time of the
next revision
19.
In its Tariff Order dated
1st July, 2004, while introducing the two-part tariff (clause 13,
page 7), the Commission had directed that MD meters be installed for all consumers
with sanctioned load of 20 kW or more
(clause 19, page 8). The Commission
also stipulated (Annexure 5, and approved Tariff Booklet) that LF-2 consumers
with sanctioned load of 20 kW above, or with monthly consumption exceeding
3000 kWh, would be governed by the LTP-2 (industrial) tariff once MD meters
are installed. However, the LTP-2 category has been redefined through the interim
Order dated 30th September, 2004 to include only consumers with
sanctioned load above 50 HP, and retrospective effect has now been given to
this modification. Therefore, the Commission has also decided now to similarly
modify this provision regarding applicability of LTP-2 tariff to LF-2 consumers
in order to make it consistent. Accordingly, LF-2 consumers with sanctioned
load above 37.5 kW (50 HP) or monthly consumption exceeding 5625 kWh would
be billed at LTP-2 rates. This modification will also be applicable with retrospective
effect from 1st July,
2004, and the change in billing demand definition and conditions thereof at
para 17 above will also be applicable to them. In this case also, the excess
billing and recovery arising from these modifications will be refunded by
REL through energy bills or by other means, without interest, by 31st
March, 2005. In may be noted, however,
that there is no change in the Commission’s directions with regard to installation
of MD meters for all consumers with
sanctioned load of 20 kW or more, which would also generate a data base enabling
the Commission to consider several options in future tariff determinations,
such as ToD tariff, incentives, etc.
20. Thus, as a result of the foregoing, the
modifications in tariff and categorisation effected by this Order are as follows:
(A) LTP-1/2
|
Tariff
as per Order dated 1.7.2004
|
Revised
Tariff w.e.f. 1.7.2004 (this Order)
|
||||
| Category | Fixed Charges |
Energy
Charges
|
Category | Fixed Charges |
Energy
Charges
|
|
(paise/kWh)
|
(paise/kWh)
|
||||
| LTP-1 (0 to 15 HP) |
Rs.150 per month |
400
|
LTP-1 (0 to 50 HP) |
Rs.150 per month |
400
|
| LTP-2
(above 15 HP) |
Rs.374 per kVA |
300
|
LTP-2
(above 50 HP) |
Rs.374 per kVA |
300
|
(B)
LF-2
|
Tariff
as per Order dated 1.7.2004
|
Revised
Tariff w.e.f. 1.7.2004 (this Order)
|
||||
| Category / Slab of Consumption | Fixed Charges |
Energy
Charges
|
Category | Fixed Charges |
Energy
Charges
|
| (Rs./Month) |
(paise/kWh)
|
(Rs./Month) |
(paise/kWh)
|
||
| LF-2 (0 to 15 HP/ 20 kW) | LF-2 (0 to 50 HP/ 37.5 kW) | ||||
| 0-300 units | 150
per connection.(Additional Fixed Charge of Rs. 150 per 10 kW load or part
thereof above 10 kW load shall be payable). |
400
|
Rs.150
per connection (Additional Fixed Charge of Rs. 150 per 10 kW load or part
thereof above 10 kW load shall be payable). |
400
|
|
| 301-1000 units |
450
|
450
|
|||
| >1000 units (only balance units) |
500
|
500
|
|||
|
LF-2
(above 15 HP/20 kW)
|
LF-2
(above 50 HP/ 37.5 kW)
|
||||
With
MD meter and / or monthly consumption over 3000 units (kWh) per month |
Rs.374 per kVA |
300
|
With
MD meter and / or monthly consumption over 5625 units (kWh) per month |
Rs.374 per kVA |
300
|
(C)
MONTHLY BILLING DEMAND
For
LTP-2 consumers as recategorised above, and for LF-2 consumers above 50 HP/
37.5 kW:
Actual
Maximum Demand recorded in the month from 0600 to 2200 hours, or 50% of the Sanctioned Load/Connected Load/Contract
Demand, as the case may be, with retrospective effect from 1st
July, 2004, and upto 31st March, 2005.
21. At the hearing on 20th September,
2004, the Commission had made it clear that it was not admitting the Petition
to the extent of the other issues raised by REL, inasmuch as they were outside
the scope of review and did not meet the test of Regulation 85 of the Conduct
of Business Regulations (cited at para 2 above). They may be agitated, if at all, in appeal before
the competent forum as provided by law. These
other issues are addressed below to the extent that any clarification is necessary
or relevant.
Capital
expenditure in FY04 and FY05
22. REL have stated that the entire capital
expenditure in FY04 should be allowed
since it has been incurred before the the Tariff Order was issued, on the
same reasoning as applied by the Commission for allowing the capital expenditure
incurred upto FY03, and that the Detailed Project Reports (DPR) for the remaining
expenditure of Rs. 43.07 crore should not be required to be submitted.
23. REL have also stated that, although the
Commission had asked them to submit CEA clearances for capital investment
undertaken upto FY03, such clearances are not available since they were not required to be obtained from CEA.
24. The Commission cannot accept the argument
that the capital expenditure incurred in FY04 should be allowed without scrutiny
of DPRs simply because it has already been incurred. The Petition for FY04
was before the Commission, and the Commission has given its ruling on FY04
alongwith the tariff determination for FY05. Further, the Commission has not
disallowed the expenditure of Rs. 43.07 crore, but directed REL to submit
the DPRs so that its prudency and cost-benefit can be evaluated. However,
the Commission accepts REL’s contention regarding the non-availability of
CEA clearances for past investments.
Normative
Debt-Equity Ratio
25. REL have submitted that retrospective application
of a normative debt-equity ratio of 70:30 for capital investments made in
FY04 prejudices the interest of their shareholders, since REL have funded
the entire capital expenditure through equity in the absence of any clear-cut
directives to fund it on a normative debt-equity basis. REL have stated that
this is an error apparent on the face of the record justifying review in terms
of Regulation 85.
26. The Commission does not accept REL’s contention,
since the Petition for FY04 was before it, and the Commission has given its
ruling on FY04 along with the tariff determination for FY05. Moreover, the
Commission has clearly explained the rationale for applying a normative debt-equity
ratio of 70:30 in its Tariff Order dated 1st July, 2004. Essentially REL are seeking a substantive modification
in the Order and are questioning the fundamental basis of the tariff determination
and the considered judgement of the Commission, which is outside the scope
of review.
Employee Expenses
27. REL have submitted that there is some mistake
or error apparent on the face of the record in the computations made by the
Commission while determining the employee expenses for FY05. REL have stated
that the level of employee expenses allowed by the Commission is inadequate
and needs to be reconsidered as a matter of review of its Order.
16.
28. REL
have stated that the actual employee expenses of Rs. 168 crore in FY 04 included Rs. 30 crore of wage arrears for FY03. Thus,
the actual expense on account of wages in FY 04 was Rs. 138 crore, which is
projected to increase to Rs. 157 crore in FY05, as against the Commission’s
approval of Rs. 126 crore. REL have also sought that the entire VRS expenditure
should be amortised in FY 05 itself, rather
than spreading it over three years.
29. The Commission had relied on the various
data and evidence placed before it by REL while determining the reasonable
and justified level of employee expenses to be allowed for FY05. The Commission
had also considered the actual wage expenses in FY 04 as Rs. 138 crore and
the arrears towards wages in FY03 as Rs. 32 crore, in line with REL’s submission
above. However, the difference between REL’s projected employee expenditure
and the level of expenditure permitted by the Commission has arisen because
REL have not considered the impact of reduction in the number of employees
due to the VRS while estimating the employee expenditure. REL had projected
that the number of unionized staff would reduce by a thousand in FY05 due
to the VRS. If one considers the impact of this reduction in the number of
employees, and the fact that the salary revision has already been accounted
for in the actual employee expenditure in FY04, the effective increase in
employee expenditure sought by REL in FY 05 with respect to the employee expenditure
in FY04 would amount to 27%, which is very high.
30. In its Tariff Order, the Commission had
given a detailed explanation of the methodology used to determine the allowable
employee expenditure, as follows:
“The Commission has calculated the cost per employee for the past years
based on data submitted by BSES, and the 4-year CAGR which is equivalent to
the period of one wage settlement. For FY 2004-05, the Commission has estimated
the employee expenditure based on the expected number of employees (after
VRS) and the projected per employee cost, which have been projected based
on the 4-year CAGR.”
As
regards the VRS expenditure, the Tariff Order states that:
“The normal accounting practice in case of
VRS is to amortize the expense over three years. The Commission has accordingly
allowed the VRS expenditure and has amortized the expense over three years,
starting from FY 2004-05 and will provide for holding cost in future years.”
Thus,
the Commission had taken into account the impact of the wage revision, the
cost of the VRS, the expected reduction in number of employees due to the
VRS, and the projected per employee cost, while determining the employee expenses
allowable for FY05. REL’s request for review on this matter is substantive
and fundamentally questions the basis of tariff determination and the considered
judgement of the Commission, and hence does not fall within the ambit of review. In any case, in the next tariff determination
exercise, actual expenditure on employees will be known for past years.
These variations will be dealt with by truing up.
Provision
for Doubtful Debts
31. REL have submitted that the Commission
has made a computation error while determining the provision for doubtful
debts for FY04 and FY05. REL have claimed that the correct level of provisioning
on the basis of 5% of receivables would amount to Rs. 12 crore for both the
years.
32. The Commission had relied on the various
data and evidence placed before it by REL while determining the reasonable
and justified level of provisioning for doubtful debts to be allowed for FY04
and FY05. Unfortunately, the data submitted by REL at different points in
time was inconsistent and contradictory, and the Commission had to settle
on the data that was most representative, in its opinion, while estimating
the level of provisioning. In the absence of any reliable data on receivables
at the time of the Tariff Order, the Commission had relied on the data on
receivables as considered in the Financial Model submitted by REL for FY04
and FY05, wherein the amount of receivables outstanding was indicated as Rs.
101 crore and Rs. 107 crore in FY 04 and FY 05, respectively. Accordingly,
the Commission had considered these numbers for determining the provision
for bad debts. However, REL have now submitted data stating that the arrears
are higher, at Rs. 240 crore, and hence the provisioning for bad debts should
also be higher. The Commission had made a reference to the poor quality of
data submitted by REL in Section 8, page 59 of the Tariff Order, as follows:
“The Commission would like to add here that the quality of data submitted
to the Commission by BSES in its various submissions has often been deficient
in many respects, and suffers from several inconsistencies. BSES has been
submitting inconsistent data to the Commission and does not seem to have verified
the data before submission to the Commission, despite the fact that this data
is being submitted on affidavit. Despite repeated queries by the Commission,
several of these discrepancies could not be resolved. The Commission has had
to rely on selected sets of data submitted by BSES, which had detailed back-up,
while estimating the revenue and expenditure of BSES.
The
Commission is unhappy with BSES’ attitude in this regard, and directs BSES
to verify the data/information before submission to the Commission and to
avoid submission of such inconsistent data to the Commission in future”.
In
view of the above, the Commission does not agree that it has made any computation
error while determining the provisioning for doubtful debts.
Revenue
Restatement
33. In its Tariff Order dated 1st July,
2004, the Commission had directed that “BSES cannot liquidate its reserves
to levels beyond the levels considered by the Commission to meet its funding
requirement.” REL have submitted
that, in its Order dated 20th July, 2004, in the matter of rebates
given by REL to selected consumer categories and consumers, the Commission
had held that the loss in revenue due to these rebates would have to be borne
by BSES as they had not been approved, as required, by the Commission. Hence
REL have urged the Commission to permit them to compensate themselves for
the impugned rebates by drawing from the reserve and contingency reserves.
34. It
is the responsibility of REL’s statutory auditor to ensure that REL’s books
of accounts are in compliance with the Companies Act, 1956 and various Accounting
Standards issued by the Institute of Chartered Accountants of India.
35. The Commission is of the view that its
method of treating the income lost due to the rebates as notional income and
setting this off against the additional standby charges payable by REL is
a perfectly valid regulatory treatment of the matter. REL should ensure that
its future Petitions for approval of ARR and Tariff are submitted based on
the restatements carried out as per the Tariff Order dated 1st
July, 2004.
Tariff
Categorization
36. REL have urged the Commission to retain
the earlier categorization of LTP-1, wherein even lift, water pump and fire
fighting equipment, etc. upto 15 HP, and non- industrial load upto 20 kW were
included under LTP-1, considering the fact that they would face a significant
loss in revenue. The Commission does not find any merit in this request, which
also seeks a substantive modification outside the scope of review. REL have
also not submitted any supporting data regarding significant loss of revenue
on this count. Further, the Commission’s categorization of such non-industrial
motive load consumers is consistent with the approach adopted by it in the
case of MSEB. Hence, REL’s request for review on this count is rejected.
Prompt
Payment Incentive
37. REL have submitted that the prompt payment
incentive should be extended to the residential category also since delayed
payment charges are applicable to all categories, including residential. The
change sought by REL does not meet the parameters for review. Although the
Commission believes that in principle there is merit in the suggestion, it
had taken a conscious decision in this regard keeping in view the profile
and circumstances of MSEB and other Licensees also. However,
the Commission would be inclined to revisit the matter of extending the incentive
to residential consumers also in future tariff determinations..
Interest
rate on arrears
38. REL have submitted that the slab-wise interest
rate on arrears prescribed by the Commission is complicated, and makes it
difficult for REL to explain to consumers the basis of calculation of total
dues spread over a long period owing to differing rates applicable for different
periods. REL have urged the Commission to standardize the interest rate applicable
on arrears irrespective of time period, at say 15% p.a., for easy comprehension
of arrears and interest.
39. The system of differential interest rates
across time periods has been introduced by the Commission some time ago in
respect of MSEB in the rest of the State, so as to provide an escalating disincentive
for prolonged non-payment of arrears by consumers. The Commission does not agree that this method
of computing arrears is complicated or cannot be understood. MSEB have been
following this system for quite some time without difficulty, and REL should
not have any problems in doing the same..
40. With this Order, the Commission disposes
of the Petition filed by REL seeking review of its Order dated 1st July,
2004 on various counts.
| Sd/- | Sd/- | |
| (A. Velayutham) | (Pramod Deo) | |
| Member | Member | |
|
Sd/-
|
||
|
(A.M.
Khan)
|
||
|
Secretary,
MERC
|
|
|