Select a year to see a list of Orders
About Us
Photo Gallery
Electricity Act, 2003
Rules & Regulations
Press Release
Events for the month
Selected RoP
Orders
FOCA
Annual Reports
GoM Notifications
Other Links

MERCINDIA
Website
Search


Consumer
1. Consumer Education
2. Consumer Grievances
3. Appellate Authority
4. Forum & Ombudsman
5. Orders by the Ombudsman
Advice to GoM
Restructuring of MSEB
Viability of Mula Pravara Electric Co-op. Society (MPECS)

For viewing documents in pdf format Please Download Acrobat Reader and WinZip


TOTAL NUMBER OF ORDERS FOR THE YEAR 2006: 93

View
/
Download

Case No. Description
(In the matter of)
Date
View
 
123KB
30 of 2006
Approval of TPC-D's Schedule of Charges
22.12.2006
View
 
55KB
37, 38 & 39 of 2006
Petitions filed by Maharashtra Industrial Development Corporation (MIDC) seeking review of (i) ARR and Tariff Petition of TPC's Order dated 3.10.2006 passed in Case Nos. 12 & 56 of 2005, (ii) MSPGCL's Order dated 7.09.2006 passed in Case No. 48 of 2005 and MSEDCL's Order dated 29.09.2006 passed in Case No. 54 of 2005 and (iii) ARR and Tariff Petition of REL's Order dated 3.10.2006 passed in Case Nos. 25 & 53 of 2005 for Grant of special benefits for procurement of power as a SEZ Developer
22.12.2006
View
 
64KB
49 of 2006
Review of Load Management Charges imposed by the Commission through the Tariff Order for The Tata Power Company Ltd. (TPC) for FY 2006-07 in Case Nos. 22 of 2005 and 56 of 2005
21.12.2006
View
 
75KB
40 of 2006
Petition of Marathwada Industries Association seeking revision in energy bills as per HTP-II tariff as per Commission's Orders dated 28th April 2000 and 5th May 2000 and consequent refund of excess amounts collected by MSEB under HTP-I tariff
21.12.2006
View
 
64KB
38 of 2005
Reliance Energy Limited's [REL] application for Review of Order dated 9th December 2005 in Case No 3 of 2003
15.12.2006
View
 
67KB
39 to 45 of 2003
Application of The Tata Power Company Limited [TPC] for grant of distribution licenses using own distribution system (Total 7 applications) [(1) Bhandup circle, (2) Vashi circle, (3) Kalyan, Dombivali, Ulhasnagar & Shahad, (4) Khopoli, (5) Lonavala, (6) Nasik 1 & 2 (U) divisions, (7) Pune (U) zone]
14.12.2006
View
 
46KB
38 of 2003
M/s Reliance Energy Limited [REL] (erstwhile BSES Limited) application for grant of distribution license using own distribution system in the area of supply covered by the Brihan Mumbai Electric Supply & Transport Undertaking (BEST)
14.12.2006
View
 
67KB
61 of 2003
Five applications filed by Maharashtra State Electricity Distribution Company Limited [MSEDCL] (erstwhile Maharashtra State Electricity Board) for grant of Distribution Licenses in respect of (i) `P' South Ward (Aarey Milk Colony), (ii) `P' South Ward (Dindoshi, Yash Dham, Gokul Dham, Nagari, Niwara Parisar), (iii) `S' Ward (Goregaon-Vikhroli link Road, Sainath Nagar, Saigal Wadi, Chetna Nagar, Hiranandani, Powai), (iv) `S' Ward (Lok Gaurav, Suyog Industrial Estate and other), and (v) `L' Ward (Ansa Industrial Estate, Raheja Vihar)
14.12.2006
View
 
88KB
22 to 26
of
2003
M/s. Reliance Energy Limited [REL] (erstwhile BSES Limited) application for grant of distribution licenses using own distribution system (Total 5 applications) [(1) Nasik 1&2 divisions (2) Aurangabad (U) Circle (3) Nagpur (U) Zone, (4) Pune (U) Zone (5) Vashi & Bhandup Circle]
14.12.2006
View
 
119KB
34 of 2006
Review of Determination of Annual Revenue Requirement (ARR) for FY 2006-07 for Maharashtra State Power Generation Company Ltd. (MSPGCL)
07.12.2006
View
 
95KB
44 of 2006 &
45 of 2006
Review of Load Management Charges imposed by the Commission through the Tariff Order for Reliance Energy Limited (REL) for FY 2006-07 in Case No. 25 of 2005 and 53 of 2005
30.11.2006
View
 
44KB
22 of 2006
Petition filed by M/s Reliance Energy Ltd. for review of Order dated 27.06.2006 in Case No. 58 of 2005 for Transmission Pricing Framework
28.11.2006
View
 
58KB
25 and 53 of 2005
and
12 and 56 of 2005
CLARIFICATORY ORDER
ARR Petition of REL for FY 2005-06 and ARR & Tariff Petition for FY 2006-07, and ARR Petition of TPC for FY 2005-06 and ARR & Tariff Petition for FY 2006-07
09.11.2006
View
 
83KB
19 of 2006
Petition filed by Shri. Sambhaji Mohanrao Shitole regarding levy by Reliance Energy Limited (REL) of charges towards service line contribution
08.11.2006
View
 
80KB
32 of 2006
Review of BEST - Supplementary Order Dated 26th Sept, 2006 in Case No. 4 of 2004
08.11.2006
View
 
186KB
25 of 2006
Approval of REL-Distribution's Schedule of charges
02.11.2006
View
 
18KB
24 of 2005
In the matter of General Conditions and Specific Conditions applicable to Distribution Licensees
31.10.2006
View
 
24KB
4 of 2006
In the matter of Clarifications sought by M/s Balaji Electro Smelters Ltd., on Load Regulation for High Tension Continuous and Non-continuous Industries

30.10.2006
View
 
771KB
54 of 2005
Approval of Maharashtra State Electricity Distribution Company Limited (MSEDCL)'s Annual Revenue Requirements for FY 2004-05, FY 2005-06 & FY 2006-07, And Determination of Tariff for FY 2006-07

Annexure V - List of Objectors

TARIFF BOOKLET
View LT Tariff Booklet Applicable from October 1, 2006 to March 31, 2007
View HT Tariff Booklet Applicable from October 1, 2006 to March 31, 2007

CLARIFICATORY ORDER - 04-05-2007
20.10.2006
View
 
114 KB
21 of 2006
Review of Determination of Annual Revenue Requirement (ARR) for FY 2006-07 for Maharashtra State Electricity Transmission Company Ltd. (MSETCL)
19.10.2006
View
 
167 KB
22 of 2005
Approval of Long-term purchase of power by MSEDCL through Competitive Bidding Process
17.10.2006
View
 
52 KB
13 of 2006
Petition filed by Maharashtra State Electricity Distribution Company Limited seeking extension of time frame under Section 55(1) of the Electricity Act, 2003
13.10.2006
View
 
109 KB
26 of 2006
Approval of BEST'S Schedule of Charges
12.10.2006
View
 
91 KB
23 of 2006
Complaint filed by Shri. Harshad Sheth on behalf of Shri L. D. Sheth, Shri S.A. Dhurve, M/s Udhalik Steel Industries and Shri Loya Hiralal Pandurang under Sections 142, 146 and 150 of Electricity Act, 2003
11.10.2006
View
 
40 KB
12 of 2006
Petition filed by the MSEDCL seeking to maintain the due date of payment of bills as fifteen days for all consumers of MSEDCL
11.10.2006
View
 
45 KB
16 of 2006
Petition filed by Shri. Vinodkumar Girdharilal Mittal of Malegoan Jankalyan Seva Samiti, Dist., Nashik raising issues of discrimination in supply and load shedding on industrial and residential consumers
09.10.2006
View
 
1.40MB
12 & 56 of 2005
In the matter of Annual Revenue Requirement (ARR) Petition of TPC Limited for FY 2005-06 and ARR & Tariff Petition for FY 2006-07
03.10.2006
View
 
791KB
25 & 53 of 2005
In the matter of Annual Revenue Requirement (ARR) Petition of REL for FY 2005-06 and ARR & Tariff Petition for FY 2006-07

TARIFF BOOKLET
View Applicable from
October 1, 2006 to March 31, 2007
03.10.2006
View
 
63 KB
31 of 2006
In the matter of Determination of Transmission Tariff for Intra-State Transmission System (InSTS) for FY 2006-07
29.09.2006
View
 
387 KB
54 of 2005
OPERATIVE ORDER
Approval of Maharashtra State Electricity Distribution Company Limited (MSEDCL)'s Annual Revenue Requirements for FY 2004-05, FY 2005-06 & FY 2006-07, and Determination of Tariff for FY 2006-07
29.09.2006
View
 
19 KB
11 of 2006
Application for permission for recruitment of personnel of pay group III and IV categories in 250 MW New Parli and 250 MW New Paras TPS andexpansion and other power stations / offices of Maharashtra State Power Generation Co Ltd.
27.09.2006
View
 
45 KB
4 of 2004
SUPPLEMENTARY ORDER
Determination of Annual Revenue Requirement (ARR) and Tariff for 2004-05 & 2005-06 for Brihan-Mumbai Electric Supply & Transport Undertaking (BEST)
26.09.2006
View
 
24 KB
59 of 2005

ERRATA
Complaint filed by Electricity Consumers Association alleging contravention by the Maharashtra State Electricity Distribution Company Limited of the regulations made by the Commission under Section 42(5)(6)(7) of Electricity Act, 2003

25.09.2006
View
 
65 KB
59 of 2005

Complaint filed by Electricity Consumers Association alleging contravention by the Maharashtra State Electricity Distribution Company Limited of the regulations made by the Commission under Section 42(5)(6)(7) of Electricity Act, 2003

ERRATA Dated:25.09.2006

18.09.2006
View
 
55 KB
15 of 2006
Petition filed by REL seeking directions upon TPC to supply additional outlets to REL at certain specified Receiving Stations of TPC
14.09.2006
View
 
55 KB
14 of 2006
Petition filed by REL seeking directions upon TPC to make available previously surrendered outlets to REL at certain specified Receiving Stations of TPC
14.09.2006
View
 
62 KB
10 of 2006
Petition filed by M/s. Renewable Energy Developers Association of Maharashtra for implementation of Commission's Order dated 24th November 2003 and Clarificatory Order dated 30th September 2004 in Case Nos. 17(3), 3, 4 & 5 of 2002 read with Case Nos. 7, 15 and 16 of 2004
12.09.2006
View
 
297 KB
70 of 2005
Approval of MSEDCL Schedule of charges
08.09.2006
View
 
311 KB
48 of 2005
Approval of Maharashtra State Power Generation Company Limited (MSPGCL)'s Annual Revenue Requirements for FY 2005-06 & FY 2006-07, and Determination of Tariff for FY2006-07
07.09.2006
View
 
137 KB
9 of 2006
Methodology for computation of Cross-Subsidy Surcharge for Open Access transactions
05.09.2006
View
 
20 KB
17 of 2006
ERRATA
Suo Motu Review of Progress of Pilot DSM projects (CFL Scheme)/ Programmes undertaken by M/s. Reliance Energy Limited
05.09.2006
View
 
173 KB
6 of 2006
Long term Development of Renewable Energy Sources and associated Regulatory (RPS) Framework
16.08.2006
View
 
104 KB
18 of 2006
Suo Motu Review of Progress of Pilot DSM projects/ Programmes undertaken by MSEDCL.
16.08.2006
View
 
84 KB
17 of 2006
Suo Motu Review of Progress of Pilot DSM projects / Programmes undertaken by M/s. Reliance Energy Limited
16.08.2006
View
 
84 KB
69 of 2005
Petition filed by Tata Power Company Limited seeking a review of Commission's Order dated 2nd March 2006 in Case No. 46 of 2005 (reg. Strategy to bridge the Demand-Supply Gap in the City of Mumbai.)
16.08.2006
View
 
68 KB
61 of 2005
Contravention of Section 46 of EA, 2003 and Regulation 10.5 of MERC (Electricity Supply Code and other Conditions of Supply) Regulations, 2005 by Reliance Energy Limited
16.08.2006
View
 
80 KB
47 of 2005
MSEDCL Petition for approval of rates for power purchase from Captive Power Project Holders
11.08.2006
View
 
49 KB
67 of 2005
Petition filed by Dr. Kirit Somaiya and Shri. Sardar Tarasingh seeking review of Commission's Order dated 10th January 2006 in Case No. 35 of 2005 (reg. Revision in the Principles & Protocol for load shedding by MSEDCL)
11.08.2006
View
 
40KB
45 of 2005
Petition filed by M/s. Sanjay Ashok Co-operative Housing Society Ltd., for restraining the Brihan Mumbai Electric and Transport Undertaking from constructing a sub-station
11.08.2006
View
 
16 KB
2 of 2006
MSEDCL Petition for Approval of Short Term Power Purchase for the Period October 2005 to March 2006
07.08.2006
View
 
41 KB
46 of 2005
Strategy to Bridge the Demand-Supply Gap in the City of Mumbai
21.07.2006
View
 
56 KB
37 of 2005
MSEDCL Petition for Review of Order dated 8.8.2005 in Case No. 37 of 2003 regarding dispensation for procurement of power from Biomass based power generators
19.07.2006
View
 
36 KB
62 of 2005
Application of M/s Bekaert Industries Pvt. Ltd. seeking exemption from staggering day and 90% load regulation target
19.07.2006
View
 
53 KB
41 of 2005
Petition filed by M/s. Menon Ancillaries & Siddharth Industries - Complaint against violation of Sections 126, 135 and 138 of Electricity Act, 2003 and non-compliance of directions made under Commission's letters dated 8.4.2005 and 19.7.2005 by Maharashtra State Electricity Distribution Company Limited
13.07.2006
View
 
81 KB
68 of 2005
Petition filed by Dr. Kirit Somaiya and Shri. Prakash Mehta for review of the Commission's Order dated 25th February 2006 in Case No. 4 of 2004
10.07.2006
View
 
93 KB
27 of 2005
BEST Petition for Approval of Power Purchase Agreement between BEST and TPC
07.07.2006
View
 
45 KB
5 of 2004
Petition filed by M/s. Jai Bamleshwari Rice Sortex seeking quashing of MSEB Circular No. D.V.S/2003/4347 dated 24th September 2003 and other reliefs
06.07.2006
View
 
79 KB
36 of 2005
Petition of M/s. Raymond Limited seeking withdrawal of additional 10% Demand Charges charged by MSEDCL on energy bills against use of CPP and refund of excess paid in energy bills along with interest, etc.
03.07.2006
View
 
35 KB
64 & 65 of 2005
Petitions filed by M/s. Maharashtra Enviro Power Ltd. and M/s. Vidarbha Enviro Protection Ltd. for determination of tariff
for supply of electricity to the distribution licensee from their Common Hazardous Waste Treatment Plants
29.06.2006
View
 
45 KB
42 of 2005
Application of Shri B M Kanitkar regarding use of electrical distribution system of
Maharashtra State Electricity Distribution Company Limited for purposes
other than electricity under Section 51 of the Electricity Act (EA) 2003
29.06.2006
View
 
261 KB
49 of 2005
Determination of Annual Revenue Requirement (ARR) for FY 2006-07 for
Maharashtra State Electricity Transmission Company Ltd. (MSETCL)
28.06.2006
View
 
94 KB
27 of 2003
Adoption and implementation of safety measures by Utilities/ Distribution Licensees Application dated 27th August 2004 of Shri. Khedkar of Akhil Bhartiya Grahak Panchayat, Pune Compliance of Order dated 7th July 2004 passed by MERC
28.06.2006
View
 
219 KB
58 of 2005
Development of Transmission Pricing Framework for the State of Maharashtra and other related matters
27.06.2006
View
 
45 KB
5 of 2006
Application of M/s Balaji Electro Smelters Ltd. for Load Regulation for High Tension Continuous and Non-Continuous Industries - Clarification thereof
19.06.2006
View
 
38 KB
44 of 2005
Complaint filed by Shri. Harshvardhan E.Shirsale for non-compliance by MSEDCL of Order dated 28th June, 2005 passed by Consumer Grievance Redressal Forum of MSEDCL Bhandup Zone
14.06.2006
View
 
48 KB
19 of 2005
Disruption of Power supply from 26th July, 2005 in the Mumbai Metropolitan Region
13.06.2006
View
 
35 KB
55 of 2005
Application of M/s Vidarbha Industries Association for Refund of Load Management Charges charged to the consumers of MSEDCL in the months of May, June and July 2005
8.06.2006
View
 
59 KB
63 of 2005
Application of MSEDCL for Review of Order dated 1.02.2006 in Case No. 32 of 2005
5.06.2006
View
 
35 KB
43 of 2005
Applicability provision of Standard of Performance Regulations for providing new connections to agricultural pump sets in Maharashtra
1.06.2006
View
 
174 KB
01 of 2006
MSEDCL Proposal for approval of recovery of additional cost as a reliability charge for mitigating load shedding in Pune Circle
16.05.2006
View
 
63 KB
66 of 2005
Review Petition in relation to MERC Order dated 02.03.2006 regarding Strategy to Bridge the Demand-Supply Gap in the City of Mumbai
16.05.2006
View
 
97 KB
30 of 2005
Petition filed by MSETCL for approval of SLDC Budget for FY2005-06 and FY2006-07
16.05.2006
View
 
144 KB
01 of 2006
[Draft Order] MSEDCL Proposal for approval of recovery of additional cost as a reliability charge for mitigating load shedding in Pune Circle
---
View
 
59 KB
03 of 2006
MSEDCL Petition for Approval of Short Term Power Purchase for the Period April to June 2006
28.04.2006
View
 
59 KB
60 of 2005
Mumbai Hoarding Owners Association Petition for review of MERC Order dated 2.03.2006 in Case No. 46 of 2005
18.04.2006
View
 
50 KB
-
Applicability of Maharashtra Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2005 for approval of ARR and determination of Tariff for FY 2005-06
13.04.2006
View
 
195 KB
01 of 2005
Purchase of Power from Bhandardara Hydro Electric Project (Phase II)
10.04.2006
View
 
102 KB
11 of 2005
Application of M/s. Shah Construction Company for seeking supply of power to their building 'Pranay Vidya' in the context of Commission's Order dated 3rd July, 2003
03.04.2006
View
 
39 KB
39 of 2005
Application of M/s Hanil Era Textiles Ltd for Transmission Licence
28.03.2006
View
 
79 KB
52 of 2005
Maharashtra State Electricity Distribution Company Limited (MSEDCL) Petition for Review of Regulations relating to FAC formula
21.03.2006
View
 
42 KB
40 of 2005
Clarifying the modalities in respect of Wind Energy Generation for 'Self-Use'
13.03.2006
View
 
601 KB
4 of 2004

Determination of Annual Revenue Requirement (ARR) and Tariff for 2004-05 & 2005-06 for Brihan-Mumbai Electric Supply & Transport Undertaking (BEST)

SUPLEMENTARY ORDER Dated 26.09.2006

9.03.2006
View
 
37 KB
29 of 2005
Confederation of Indian Industry (CII) Proposal to use Captive Power to mitigate load shedding in Pune Urban Circles of MSEDCL
2.03.2006
View
 
139 KB
46 of 2005
Strategy to Bridge the Demand-Supply Gap in the City of Mumbai
2.03.2006
View
 
106 KB
4 of 2004
Determination of Annual Revenue Requirement (ARR) 2004-05 & 2005-06 and Tariff for 2005-06 of Brihan-Mumbai Electric Supply & Transport Undertaking (BEST)
25.02.2006
View
 
44 KB
35 of 2005
Revision in the Principles and Protocol for Load Shedding by MSEDCL -
Clarification of reference period for comparison of consumption and Corrigendum on Annexure to Order
21.02.2006
View
View
 
55 KB
32 of 2005
Application of M/s Thermo Touch Enterprises, Pune for seeking redressal under Section 142 and Section 146 of EA 2003
01.02.2006
View
 
166 KB
29 of 2005
Confederation of Indian Industry (CII) Proposal to use Captive Power to mitigate load shedding in Pune Urban Circles of MSEDCL
25.01.2006
View
 
50 KB
17 of 2005
Excessive Drawal of Power on the grid by TPC and disputes and differences thereof
20.01.2006
View
 
133 KB
34 of 2005
Directions to Licensees under Section 23 of the Electricity Act, 2003
17.01.2006
View
 
14 KB
35 of 2005
Clarificatory Order & Corrigendum
Revision in the Principles and Protocol for Load Shedding by MSEDCL
13.01.2006
View
View
  39 KB
16 of 2005
Approval of Rate of Power Purchase of peak power by M/s. Reliance Energy Limited and determination of transmission charges and losses for availing open access
12.01.2006
View
  208 KB
35 of 2005
Revision in the Principles and Protocol for Load Shedding by MSEDCL
10.01.2006