Orders for the Year 2008
Total :121
|
| View |
Case No. |
Description
(In the matter of) |
Date |
|
|
34 of 2008
|
Petition filed by M/s. Lavasa Corporation Ltd. seeking Tariff Classification
for development of Hill Station
|
19-Dec-2008
|
|
|
76 of 2008
|
Complaint filed by Shri. Vishwas Maruti Patil under Sections 142,
149, 57(2) of the Electricity Act 2003
|
19-Dec-2008
|
|
|
35 of 2008
|
Petition filed by M/s Century Rayon for Clarification arising out
of RPS Order dated 16.08.2006 in Case No. 6 of 2006
|
19-Dec-2008
|
|
|
72 of 2008
|
Complaint filed by Maharashtra Paper and Board Manufacturers Association
under Section 142 of the Electricity Act, 2003 against MSEDCL
|
19-Dec-2008
|
|
|
81 of 2008
|
Petition seeking review/ clarification of the Commission's Order
dated 24.04.2007, passed in Case No. 75 of 2006, in the matter of
approval of REL's Distribution business ARR for Control Period FY
2007-08 to FY 2009-10 and Retail tariff for FY 2007-08
|
17-Dec-2008
|
|
|
58 of 2008
|
Petition filed by M/s. Renewable Energy Developers Association
of Maharashtra regarding refusal of MSEDCL to make any payment to
the wind farm developers of Group- II category for the energy that
is being fed to the MSEDCL Grid after the date of expiry of the
EPA's.
|
10-Dec-2008
|
|
|
42 of 2008
|
Petition by Maharashtra State Electricity Distribution Company
Ltd. seeking review of Order dated June 20, 2008, in the matter
of Annual Performance Review for FY 2007-08 and tariff determination
for MSEDCL for FY 2008-09
in Case No.72 of 2007.
|
10-Dec-2008
|
|
|
29 of 2008
|
Petition filed by The Tata Power Company Ltd., seeking review of
Order dated 2.04.2008 passed in Case No. 68 of 2007 in the matter
of TPC-G's APR Petition
|
01-Dec-2008
|
|
|
59 of 2008
|
Petition filed by M/s. Brihan Mumbai Electric Supply & Transport
Undertaking to allow recovery of 'under recovered FAC' for the period
of October 2007 to March 2008, increase in the cap over FAC and
allow it to recover actual FAC
|
01-Dec-2008
|
|
|
70 of 2008
|
Petition filed by M/s. The Tata Power Company Limited on Removal/
Relaxation of cap on the Fuel Adjustment Charge as per Regulation
82.6 of MERC (Terms and Conditions of Tariff) Regulations, 2005
|
28-Nov-2008
|
|
|
65 of 2008
|
Petition filed by M/s. Reliance Infrastructure Limited for Recovery
of Variation in Power Purchase Cost approved by the Commission in
REL-D Tariff Order dated June 4, 2008
|
28-Nov-2008
|
|
|
77 & 78 of 2008
|
Petition of MSEDCL for revision of the Principles and Protocols
of Load Shedding hours in the State of Maharashtra [Case No. 77
of 2008] and
MSEDCL Petition for revision of the Principles and Protocols of
Load Shedding hours in the State of Maharashtra to be implemented
from September 2, 2008 on a temporary basis. [Case No. 78 of 2008]
|
28-Nov-2008
|
|
|
45 of 2008
|
Petition filed by Brihan-Mumbai Electric Supply & Transport
Undertaking (BEST) for approval of Expression of Interest Bidding
Procedure followed to procure Renewable Energy from eligible sources
inside Maharashtra as Competitive Bidding Process
|
21-Nov-2008
|
|
|
79 of 2008
|
Complaint filed by Shri. Haribhau Digambar Khapre, of Jat Taluka
Vidyut Dharak Association
|
17-Nov-2008
|
|
|
83 of 2007
|
Petition filed by M/s. Captive Power Producers Association (CPPA)
seeking clarification arising out of the Commission's RPS Order
dated August 16, 2006 in Case No. 6 of 2006
|
17-Nov-2008
|
|
|
63 of 2007
|
Petition for deciding the methodology for sharing of Clean Development
Mechanism (CDM) benefits between investors and Utility
|
17-Nov-2008
|
|
|
61 of 2008
|
Maharashtra State Electricity Distribution Company Limited's
Petition for Approval of Deviations taken in Bidding Documents issued
to bidders, for procurement of 2000 MW power on Long Term Basis
under International Competitive Bidding Process (Case-I).
|
14-Nov-2008
|
|
|
50 of 2008
|
Petition filed by Mumbai International Airport seeking
review of Order dated 4.6.2008 to the extent it classifies the Petitioner
under the category of HT -II Commercial
|
12-Nov-2008
|
|
|
64 of 2008
|
Complaint filed by Akhil Bharatiya Grahak
Panchayat, Latur under Sections 142, 146 and 149 of the Electricity
Act, 2003 |
12-Nov-2008
|
|
|
39 of 2008
|
Petition of Shri Pratap Hogade regarding illegal levy of
Service Line Contribution charges and refund thereof to consumers
|
05-Nov-2008
|
|
|
85 of 2008
|
[INTERIM ORDER] Petition of MSEDCL seeking directions
in respect of EPA dated 2.9.2002 executed between MSEDCL and M/s.
Purti Sakhar Karkhana Limited
|
27-Oct-2008
|
|
|
17 of 2007
|
Maharashtra State Power Generation Company Ltd.'s (MSPGCL) Petition
for Approval of Lease Rent of Hydel Stations owned by GoM leased
to MSPGCL for Operation and Maintenance
|
27-Oct-2008
|
|
|
49 of 2008
|
Petition filed by M/s Pioneer Distilleries Limited for adjudication
of dispute with Maharashtra State Electricity Distribution Company
Limited (MSEDCL) regarding refusal of MSEDCL to grant permission
for laying of 33 kV line for connecting the generating plant with
the sub-station
|
22-Oct-2008
|
|
|
24 of 2008
|
Petition filed by BEST Undertaking seeking revocation of licence
of M/s. Reliance Energy Ltd., for distribution of electricity in
the suburban area
|
20-Oct-2008
|
|
|
47 of 2008
|
Complaint filed by M/s. Jat Taluka Vidyut Dharak Association for
filling up of the post of Chairman lying vacant at CGRF Kolhapur
Zone
|
14-Oct-2008
|
|
|
33 of 2008
|
Approval of Deviations taken in Request for Proposal (RFP) documents
issued to bidders, from Standard Bidding Documents issued by Ministry
of Power, for Development of Dhopave Project under International
Competitive Bidding Process (Case-2 Bidding)
|
14-Oct-2008
|
|
|
89 of 2007
|
Petition filed by Maharashtra State Electricity Distribution Company
Ltd. seeking directives in respect of purchase of wind power and/or
wheeling of energy for long term commercial arrangement from Wind
Farm Projects under Group II category, after expiry of validity
period
|
07-Oct-2008
|
|
|
60 of 2008
|
Petition filed by Shri. Haleem Mohd. Hanif Khan seeking review
of Order dated 20.6.2008 in Case No. 72 of 2007
|
29-Sep-2008
|
|
|
30 of 2008
|
Petition of Sagareshwar Sahakari Soot Girni Ltd., seeking review
of Clarificatory Order dated 17.12.2007 to the extent of applicability
of ASC and determination of bench mark consumption
|
29-Sep-2008
|
|
|
31 of 2008
|
Petition of Hotel & Restaurant Association seeking directives
under Section 142 of the EA, 2003 for non-compliance and intentional
misinterpretation of Tariff Orders dated 18.5.2007 and 20.10.2006
|
23-Sep-2008
|
|
|
45 of 2007
|
Petition filed by M/s. Lloyd Steel Industries Ltd., seeking clarification
on Incremental Additional Supply Charges (IASC) charged to the consumers
|
17-Sep-2008
|
|
|
42 of 2007
|
Petition filed by M/s. Hanil Era Textiles Limited disputing certain
bills issued by MSEDCL as illegal
|
15-Sep-2008
|
|
|
77 of 2007
|
Petition filed by M/s. Hanil Era Textiles Limited on MSEDCL not
allowing subsidized Tariff for power loom and demand of additional
amounts by MSEDCL
|
15-Sep-2008
|
|
|
13 of 2008
|
Petition of Maharashtra State Electricity Distribution Co. Ltd.
seeking reconsideration of the clauses of penalty under the Renewable
Purchase Specification
|
15-Sep-2008
|
|
|
44 of 2008
|
Clarifications sought by MSEDCL on Order dated June 20, 2008, in
the matter of the Annual Performance Review for FY 2007-08 and determination
of tariff for retail sale of electricity for MSEDCL for FY 2008-09
(Case No.72 of 2007)
|
12-Sep-2008
|
|
|
40 of 2008
|
Petition filed by MSETCL seeking review of the Commission's Order
dated May 31, 2008, in the matter of approval of APR of MSETCL for
FY 2007-08 and Revenue Requirement for FY 2008-09
|
12-Sep-2008
|
|
|
71 of 2007
|
[Errata] Maharashtra State
Power Generation Company Ltd.'s (MSPGCL) Petition for approval of
Annual Performance Review for FY 2007-08 and Tariff Determination
for FY 2008-09
|
05-Sep-2008
|
|
|
49 of 2007
|
Petition filed by M/s. New Bombay Ispat Udyog Private Limited seeking
review of Tariff Order dated October 20, 2006 read with Clarificatory
Order dated February 26, 2007
|
04-Sep-2008
|
|
|
32 of 2008
|
Complaint filed by Maharashtra Electricity Consumers Association
for filling up post of Member Secretary at MSEDCL's CGRF at Bhandup
|
02-Sep-2008
|
|
|
57 of 2008
|
Petition of Maharashtra State Electricity Distribution Co. Ltd.,
seeking increase in load shedding hours as a temporary measure
|
02-Sep-2008
|
|
|
22 of 2008
|
Petition filed by MSPGCL seeking 'In-principle' approval for development
of Machhakata & Mahanadi Coal blocks by Mine Developer-cum-Operator
through Tender Route and supply of coal against the Competitive
Coal Mining Fees
|
22-Aug-2008
|
|
|
99 of 2007
|
Application of M/s. Indiabulls Power Generation Limited for grant
of licence in accordance with the MERC (Trading License Conditions)
Regulations, 2004
Trading
Licence
|
21-Aug-2008
|
|
|
23 of 2008
|
Petition filed by Maharashtra Biomass Energy Developers Association
seeking review of Commission's Order dated 8th August, 2005 and
Order dated 19th July, 2006 passed in Case No. 37 of 2003
|
20-Aug-2008
|
|
|
54 of 2008
|
Petition by Maharashtra State Electricity Distribution Company
Ltd. (MSEDCL) seeking approval for adoption of the tariff for long
term Power Procurement under Case-I bidding under Section 63 of
the Electricity Act, 2003
|
14-Aug-2008
|
|
|
25 of 2008
and
28 of 2008
|
Petition of M/s. Yash Agro Energy Ltd., under the provisions of
Sections 86(1)(b),(c),(e) & (f) of the Electricity Act, 2003
(EA 2003) read with Clause 15.2 of the Energy Purchase Agreement
dated 25.10.2004 [Case No. 25 of 2008]
and
Complaint under Section 142 read with Section 149 of EA, 2003 [Case
No. 28 of 2008]
|
08-Aug-2008
|
|
|
06 of 2008
|
Petition filed by Reliance Energy Ltd., seeking directions under
Section 23 of the Electricity Act, 2003 for equitable allocation
of TPC-G capacity for FY 2008-09
|
06-Aug-2008
|
|
|
21 of 2008
|
Petition of Ban-Bro Metals Pvt. Ltd., seeking review of Clarificatory
Order dated 17.12.2007 to the extent of applicability of ASC and
determination of bench mark consumption
|
05-Aug-2008
|
|
|
100 of 2007
|
Petition of M/s. Life Style International Private Limited seeking
clarifications on the applicability of tariff category.
|
04-Aug-2008
|
|
|
39 of 2007
|
MSEDCL Petition for Approval of Power Purchase Agreement between
MSEDCL and MSPGCL
|
28-July-2008
|
|
|
19 of 2008
|
Petition of M/s. Vidarbha Industries Association seeking Clarification
of Order dated February 7, 2007 passed in Case No.59 of 2006
|
24-July-2008
|
|
|
17 of 2008
|
Petition filed by M/s. Sangli District Powerloom Owners Association
Ltd., seeking review of Commission's Order dated 18.05.2007 passed
in Case No. 65 of 2006
|
24-July-2008
|
|
|
07 of 2008
|
Petition filed by Reliance Energy Limited (REL) seeking clarification
in the matter of the composite transmission losses of InSTS as held
by the Commission vide its Order dated June 27, 2006 in Case No.58
of 2005
|
18-July-2008
|
|
|
18 of 2008
|
Petition filed by MSEDCL seeking review of Order dated February
16, 2008
|
17-July-2008
|
|
|
04 of 2008
|
Complaint filed by M/s. Ajanta Limited under Sections 142 and 146
of the Electricity Act, 2003
|
16-July-2008
|
|
|
03 of 2008
|
Complaint filed by Maharashtra Electricity Consumers Association
seeking penal action against MSEDCL for charging of service connection
for underground connection instead of charging of service charges
for over head connection
|
16-July-2008
|
|
|
12 of 2008
|
Complaint filed by Maharashtra Electricity Consumers Association
alleging non-compliance of CGRF's interim order
|
16-July-2008
|
|
|
95 of 2007
|
Complaint filed by Bajaj Auto Ltd., under Sections 142 and 146
of the Electricity Act, 2003
|
15-July-2008
|
|
|
20 of 2008
|
Complaint filed by Shri Shahabuddin Aamin Magdum alleging non-compliance
by MSEDCL of CGRF's Order dated September 6, 2007.
|
15-July-2008
|
|
|
18 of 2008
|
Petition filed by MSEDCL seeking review of Order dated February
16, 2008.
|
15-July-2008
|
|
|
14 & 15 of 2008
|
[Case No. 14 of 2008] Restoration of electricity supply
on installing/reconnection of a meter.
[Case No. 15 of 2008] Seeking direction upon BEST and CGRF
- BEST to release and / or reimburse the amount paid for tampering
with meter.
|
14-July-2008
|
|
|
5 of 2008
|
Maharashtra State Electricity Distribution Company Ltd. (MSEDCL)'s
Petition seeking approval for appointment of Interim Franchisee
and approval of Reliability Charges to be recovered from Pune Consumers
|
20-Jun-2008
|
|
|
72 of 2007
|
[Detailed Order] Maharashtra State Electricity Distribution
Company Ltd.'s (MSEDCL) Petition for approval of Annual Performance
Review for FY 2007-08 and Tariff for FY 2008-09
|
20-Jun-2008
|
|
|
73 of 2007
|
[Errata and Corrigendum] Brihan-Mumbai
Electricity Supply and Transport Undertaking's (BEST) Petition for
Annual Performance Review for FY 2007-08 and Tariff Determination
for FY 2008-09
|
18-Jun-2008
|
|
|
69 of 2007
|
[Errata and Corrigendum] The
Tata Power Company Ltd. (TPC) - Distribution Business' Annual Performance
Review for FY 2007-08 and Petition for Tariff Determination for
FY 2008-09
|
17-Jun-2008
|
|
|
66 of 2007
|
[Errata and Corrigendum] Reliance
Energy Ltd. Distribution Business' (REL-D) Petition for Annual Performance
Review for FY 2007-08 and Tariff Determination for FY 2008-09
|
17-Jun-2008
|
|
|
73 of 2007
|
Brihan-Mumbai Electricity Supply and Transport
Undertaking's (BEST) Annual Performance Review for FY 2007-08 and
Petition for Tariff Determination for FY 2008-09
Errata
and Corrigendum dated :18-06-2008 |
06-Jun-2008
|
|
|
-
|
Removal of difficulties under Regulation
96 of the Maharashtra Electricity Regulatory Commission (Conduct of
Business) Regulations, 2004 |
06-Jun-2008
|
|
|
69 of 2007
|
The Tata Power Company Ltd. (TPC) - Distribution
Business' Annual Performance Review for FY 2007-08 and Petition for
Tariff Determination for FY 2008-09
Errata
and Corrigendum dated :17-06-2008
Tariff
Booklet TPC-D FY 09
|
04-Jun-2008
|
|
|
66 of 2007
|
Reliance Energy Ltd. Distribution Business' (REL-D) Petition for
Annual Performance Review for FY 2007-08 and Tariff Determination
for FY 2008-09
Errata
and Corrigendum dated :17-06-2008
Tariff
Booklet REL-D FY 09
Amendments
to Tariff Booklet
|
04-Jun-2008
|
|
|
72 of 2007
|
[Operative Order]
Petition filed by Maharashtra State Electricity Distribution Company
Ltd. (MSEDCL) for Annual Performance Review (APR) for FY 2007-08 and
determination of ARR and Tariff for FY 2008-09
Errata and Corrigendum dated
:05-06-2008
|
31-May-2008
|
|
|
71 of 2007
|
Maharashtra State Power Generation Company
Ltd.'s (MSPGCL) Petition for approval of Annual Performance Review
for FY 2007-08 and Tariff for FY 2008-09
Errata
and Corrigendum dated :05-09-2008
|
31-May-2008
|
|
|
104 of 2007
|
Determination of Transmission Tariff for
Intra-State Transmission System (InSTS) for the second year of the
MYT Control Period (i.e., FY 2008-09) |
31-May-2008
|
|
|
70 of 2007
|
Maharashtra State Electricity Transmission
Company Ltd.'s (MSETCL) Petition for approval of Annual Performance
Review for FY 2007-08 and Revenue Requirement for FY 2008-09 |
31-May-2008
|
|
|
88 of 2007
|
Petition filed by MSETCL for approval of
SLDC Budget for FY 2008-09 |
30-May-2008
|
|
|
22 of 2007
|
Complaint filed by Jat Taluka Vidyutdharak
Association
|
30-May-2008
|
|
|
10 of 2008
|
[INTERIM ORDER] Petition filed by
MSEDCL seeking approval to procure additional power for mitigating
load shedding in Vashi Circle-Navi Mumbai and Thane Urban Circle,
levy of reliability charges and for appointment of Interim Franchisee
|
30-May-2008
|
|
|
67 of 2007
|
The Tata Power Company Ltd. (TPC) - Transmission
Business' Annual Performance Review for FY 2007-08 and Revenue Requirement
Petition for FY 2008-09.
|
26-May-2008
|
|
|
64 of 2007
|
Reliance Energy Ltd. Transmission Business'
(REL-T) Petition for Annual Performance Review for FY 2007-08 and
Determination of Revenue Requirement for FY 2008-09 |
26-May-2008
|
|
|
86 of 2007
|
Petition filed by Mahratta Chamber of Commerce,
Industries and Agriculture seeking delimitation of MSEDCL's area of
license |
23-May-2008
|
|
|
50 of 2007
|
Petition of M/s. Global Boards Limited seeking
clarifications from the Commission's Order dated September 11, 2007
passed in Case Nos.26 of 2007 and 65 of 2006 |
23-May-2008
|
|
|
53 of 2007
|
Providing off peak hours Banking Facility
for the CPP Power of Petitioner |
20-May-2008
|
|
|
62 of 2007
|
Short term Power Procurement by Brihan Mumbai
Electricity Supply and Transport Undertaking (BEST Undertaking) for
the month of April, May and June 2007 from different sources and removal
of difficulties regarding requirement of prior approval during a quarter
as under Regulations 25, 84 and 85 of MERC (Terms and Conditions of
Tariff) Regulation, 2005 |
20-May-2008
|
|
|
1 & 2 of 2008
|
Case No. 1 of 2008 - Maharashtra
State Electricity Distribution Company Ltd. (MSEDCL)'s Petition seeking
approval of Reliability Charges for ensuring continuous power supply
/ zero load shedding for Baramati Town and nomination of Baramati
Vyapari Mahasangh Ltd. (BVML) as Interim Franchisee for Baramati Town
Case No. 2 of 2008 - Petition of M/s. Baramati Vyapari
Mahasangh Ltd. regarding continuous power supply / zero load shedding
model for Baramati Town and nomination of Baramati Vyapari Mahasangh
Ltd. as Distributed Generation based Distribution Franchisee (DGBDF)
for Baramati Town |
08-May-2008
|
|
|
40 of 2007
|
Petition filed by Maharashtra State Electricity
Distribution Company Limited seeking review of Order dated June 26,
2007 passed in Case No. 27 of 2006 |
08-May-2008
|
|
|
32 of 2007
|
Suo Motu proceedings with regard to field
visits within the distribution area of MSEDCL |
08-May-2008
|
|
|
57 of 2006
|
Complaint filed by REDAM alleging non-compliance
by MSEDCL of the Commission's Order dated September 12, 2006 |
08-May-2008
|
|
|
98 of 2007
|
Petition filed by Maharashtra State Electricity
Distribution Company Ltd. as per direction of the Hon'ble Bombay High
Court, Nagpur Bench, on financial aspects/ viability of the Bid floated
by MSEDCL in relation to Distribution Franchisee in Nagpur |
07-May-2008
|
|
|
58 of 2007
|
Complaint filed by Shri. Shahabuddin A. Magdum
against MSEDCL |
07-May-2008
|
|
|
97 of 2007
|
Petition of M/s. Gujarat Fluoro Chemicals
Ltd., seeking revision of guidelines for power purchase and procurement
process of wind energy and the tariff applicable thereto fixed under
the Commission's Order dated November 24, 2003 |
06-May-2008
|
|
|
93 of 2007
|
Petition filed by M/s. Yash Agro Energy
Ltd., for grant of permission for third party sale |
06-May-2008
|
|
|
96 of 2007
|
Petition filed by M/s. Menon & Menon Ltd., seeking
review of Clarificatory Order dated 11.09.2007 passed in Case Nos.
26 of 2007 and 65 of 2006 |
06-May-2008
|
|
|
46 of 2007
|
Approval of Additional Quantum of Long Term Power Procurement
by MSEDCL through Competitive Bidding under Case-1 and Case-2 Bidding |
02-May-2008
|
|
|
84 of 2007
|
Petition filed by Maharashtra State Electricity Distribution
Company Limited seeking permission to recruit personnel to Pay Groups
III and IV categories in its offices |
02- |